Loading...
Hollows-CS 990707972 304 3547 07/08/99 13:12 CITY OF COPPELL 4 CITY OF COPPELL DATE: TIME: TO: FROM: RE: 7/7/99 COPPELL UTILITIES DIVISION MEMORANDUM Garreth Campbell, Construction Inspector Utilities Division Walk-thru Hollows at Northlake Woodlands I Listed below are Utility Division comments relative to walk thru. 1. Missing blowoff valve (Hollow Circle); 2" irrigtion box needs to be dry; 2' cul de sac no blowoff. 2. Lot 26A sweep t in backwards. 3. Lot 34A crushed sewer cleanout. 4. Lot 35A relocating manhole reinspect on final. 5. Chimney seal manhole- reset. 6. Paint 1 manhole ext. white (existing manhole). 7. Manhole needs center chimney ring. 8. Existing manhole with new pipe, needs regrouting around pipe. 9. Feed to subdivision needs to be marked, also need concrete ad Mallard Dr. Ma 6) ki&e_\ ;I: 13(2atA cAA \Asatv.. QvCCec.tgeG s Is, V). jA4 cl L63to mr (71,0 NO.016 P01