Coppell Greens 2-CS 99111211i12~99 17:19 CITY OF COPPELL ~ CITY OF COPPELL N0.026 D01
MEMORANDUM
FROM THE
DEPAR'Im~IENT OF PUBLIC WORKS
To: Garreth Campbell, Construction L~spector
Fron3: Larry Morton, Streets Division Aiblic Works
Date: November 22, 1999 ~: ~~,
RE: Walk thru CoppeU Greens YX ``
1. Low area where Phase I, FaUkirk Dr., meets Phase II, Fallkirk Dr.; also random
cracks and broken curb painted white.
2. 1VYu11iuny Dr., some curb joints need sealant-painted. white.
3. Reseal curb joints at inlets on Failkirk Dr.--paiinted white.
4. Stake is wncrete at valve on Laids Dr.-painted red.
~.. r~
CITY OF COAAELL PU~L(C WORJCSDF,P,4RTMEAT
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Garreth Campbell, Construction Inspector Engineering
From: Avery Rodgers, Streets Division Public Works
Date: November 12, 1999
RE: Walk-thru Coppell Greens II Drainage
1. One box needs to be leveled up at the bottom.
2. Joints need to be grouted in several inlet boxes.
3. Pipe and main pipe need to be grouted.
4. Pipes full of trash & debris.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT