Loading...
Gunner P2-CS000223Jorge Gonzales Carson Salcedo McWilliams 1201 Main Street, Suite 1530 Dallas, Texas 75202 February 23, 2000 RE: Gunner Subdivision, Phase II Dear Mr. Gonzales: The City of Coppell has reviewed the referenced plans and has the following comments to offer: 1. Any details that pertain to the building plans should be removed from the civil set. 2. A floodplain development permit will be required prior to doing any work in the 100 -year floodplain. 3. Storm drain Line G and the laterals that feed it need to be sized to handle 100 -year storm. No standing water will be allowed in the platted fire lane. Also, if detention is being proposed in any open areas, those areas need to be identified on the grading plan and the drainage plan. 4. The hydraulic grade line shown on Line C needs to be reevaluated. 5. Provide 2' minimum clearance between utility crossings or provide concrete encasing. 6. Combination water meters must be used for this development per the City Utility Department. Domestic water cannot be pulled from a full -flow 8" fire line. 7. Note 9 on the Water and Wastewater Plan needs to be examined. Based on as -built plans provided for Gunner Phase I, this connection has already been made. 8. On the Water line plan, the water line located on the western edge of the property is missing from the plan. 9. Be aware that 5' diameter sanitary sewer manholes are only required for manholes deeper than 12.5'. There are various other minor comments throughout the plans. When all comments have been addressed, please return these marked plans and two sets of revised plans to the City for review. If you have any questions, please contact me at (972) 304 -7019. Sincerely, Kent M. Collins, P.E. Civil Engineer