Kiddin' Around-CS000727972 304 3547
07i27i00 15:41 CITY OF COPPELL ~ CITY OF COPPELL
MEMORANDUM
FROM THE
DEPARTMENT ~F PUBLIC WORKS
N0.021 D01
To: G~arreth Campbell, Construction In~-pector Engineering
From: Danny Hightower, Utilities Division
Rate: duly 27, 2000
~; Walk-thru Follow-up Kiddie Arouad
1. Raise meter can.
2. Clean meter can to lower frttiags.
3. (Need at Insp.) No water holding in meter can to irispect for leak.
4. Backflow Prevention test on DC.
S. Sewer Tap needs to be ir~pected at tap after work (before covering).
6. Sewer needs a City cleanout 10' from tap on main.
CITYOFCUPPCLL AUEI.lC WORSSDEpARTAlF.NT