Loading...
ST9704-CS 990122E:3 January 22, 1999 Jeffrey C. Bryan, President Durable Specialties, Inc. P.O. Box 381788 Duncanville, TX 75138 Z- � RE: Traffic Signal Installation at 2o High School Access ST 97-04 TR Dear Mr. Bryan: ��� 0 � At the January 12, 1999 City Council meeting, the referenced project was awarded to your firm. Enclosed with his letter are four copies of the contract signed by the Mayor. Please sign the four original contracts, provide the required bonds and return three of the copies to the Engineering Department. One of the copies is for your file. Once the contracts have been signed and returned to our office, a preconstruction meeting will be scheduled and a notice to proceed letter will be issued. The inspector on this project will be Garreth Campbell. If you should have questions concerning this project please feel free to contact Garreth or myself at 972/304 -3679. Sincerely, /1 Kenneth M. Griffin, E. Director of Public Works / City Engineer 'he City With A Beautiful Future O. BOX 478 :OPPELL,TEXAS 75019 P.O. Box 478 Coppell. Texas 75019 _ 972- 462 -0022 / cc: Garreth Campbell, Construction Inspector