Loading...
Grand Cove-LR 941003Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 94.1075 CLIENT: Frank Bamburg Building Co. DATE: 3 October 1994 PROJECT: Grand Cove Estates, Coppell, TX SUPPLIER: Redi -Mix LOCATION OF POUR SET 1: Inlets, both sides of Wales Court, approx. 530' south of Bethel School Road LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 721 Truck No. 161 Cement Ticket No. 131085 Flyash Time Batched 3:09pm Sand Time Sampled 3:45pm in. Concrete Temp. (ASTM c1064) 92 °F 1.0 in. Air Content (ASTM c231) 5.0% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C1431 psi Strength 41 1.50 7 10/10/94 95,200 3370 42 1.50 7 10/10/94 95,700 3380 43 1.50 28 10/31/94 44 1.50 28 10/31/94 TECHNICIAN: MAC (2:30pm- 4:30pm) DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg (1) Site Concrete, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 28 -Day Average 3000 7, Oiett* (214) 351 -6419 Fax (214) 351 -5148 Hooper Engineering Laboratories, Lk Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 94.1075 CLIENT: Frank Bamburg Building Co. DATE: 3 October 1994 PROJECT: Grand Cove Estates, Coppell, TX SUPPLIER: Redi -Mix LOCATION OF POUR SET 1: Inlets, both sides of Wales Court, approx. 530' south of Bethel School Road LOCATION OF POUR SET 2: SAMPLE DATA: Truck No. 161 Cement Ticket No. 131085 Flyash Time Batched 3:09pm Sand Time Sampled 3:45pm in. Concrete Temp. (ASTM C1064) 92 °F 1.0 in. Air Content (ASTM C231) 5.0% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 41 1.50 7 10/10/94 95,200 3370 42 1.50 7 10/10/94 95,700 3380 43 1.50 28 10/31/94 115,900 4100 44 1.50 28 10/31/94 120,800 4270 28 -Day Average 4190 TECHNICIAN: MAC (2:30pm- 4:30pm) SET 1 SET 2 MIX NO. 721 DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg (1) Site Concrete, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 3000 fl;illa 7, zott* (214) 351 -6419 Fax (214) 351 -5148