Loading...
Grand Cove-LR 940920Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 94.1075 CLIENT: Frank Bamburg Building Co. DATE: 20 September 1994 PROJECT: Grand Cove Estates, Coppelf, TX SUPPLIER: Site Concrete LOCATION OF POUR SET 1: Alley approach, southwest end of Wales Court, from center of approach to 8' west of center, from Wales Court to 6' from street LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched 8:55am Sand Time Sampled 9:25am in. Concrete Temp. (ASTM c1064) 79 °F 1.0 in. Air Content (ASTM C231) 2.6% Water Unit Weight (ASTM 0138) 143.81 Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 37 7.00 7 09/27/94 38 7.00 7 09/27/94 39 7.00 28 10/18/94 40 7.00 28 10/18/94 *Representative of Hooper Engineering went to project on 9/21/94 to pick up these cylinders. Upon arrival, he found that these cylinders had been destroyed. Appeared to have been run over by a vehicle. TECHNICIAN: MAC (8:30am- 10:30am) 2870 Walnut Hill Lane Dallas, Texas 75229 DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg (1) Site Concrete, Inc. (1) City of Coppell, Garreth Campbell 28 -Day Average 3000 (214) 351 -6419 Fax (214) 351 -5148