Loading...
Grand Cove-LR 940728LOCATION TECHNICIAN: CDJ Hooper Engineering Laboratories, Inc. Construction Materials Testing 2870 Walnut Hill Lane Dallas, Texas 75229 REPORT OF IN -PLACE DENSITY TESTS CLIENT: Frank Bamburg Building Co. DATE: 28 July 1994 PROJECT: Grand Cove Estates, Coppell, TX JOB NO.: 94.1075 MATERIAL DESCRIPTION: 1) On -Site Fill Tan Light Grey Sandy Clay ASTM D 698 STANDARD PROCTOR: 1) 101 .0 pcf 16.0% Moisture MOISTURE DRY PERCENT REQUIRED PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION PCF BELOW Backfill Repair Holes, SUBGRADE Sanitary Sewer Line A 42) approx. Station 6+50 1 2' 17.9 98.6 97.6 95+ Optimum 2% 43) approx. Station 10+50 1 1 .5' 15.5 99.0 98.0 DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg (1) C. W. Young Construction (1) City of Coppell, Garreth Campbell Ihee g,Iltit* (214) 351 -6419 Fax (214) 351 -5148