Grand Cove-LR 940728LOCATION
TECHNICIAN: CDJ
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
2870 Walnut Hill Lane Dallas, Texas 75229
REPORT OF IN -PLACE DENSITY TESTS
CLIENT: Frank Bamburg Building Co. DATE: 28 July 1994
PROJECT: Grand Cove Estates, Coppell, TX JOB NO.: 94.1075
MATERIAL DESCRIPTION: 1) On -Site Fill Tan Light Grey Sandy Clay
ASTM D 698 STANDARD PROCTOR: 1) 101 .0 pcf 16.0% Moisture
MOISTURE DRY PERCENT REQUIRED
PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION
PCF
BELOW
Backfill Repair Holes, SUBGRADE
Sanitary Sewer Line A
42) approx. Station 6+50 1 2' 17.9 98.6 97.6 95+
Optimum 2%
43) approx. Station 10+50 1 1 .5' 15.5 99.0 98.0
DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg
(1) C. W. Young Construction
(1) City of Coppell, Garreth Campbell
Ihee g,Iltit*
(214) 351 -6419 Fax (214) 351 -5148