Loading...
Grand Cove-LR 940727Hooper Engineering Laboratories, Inc. Construction Materials Testing CLIENT: Frank Bamburg Building Co. REPORT OF IN -PLACE DENSITY TESTS PROJECT: Grand Cove Estates, Coppell, TX JOB NO.: 94.1075 MATERIAL DESCRIPTION: 1) On -Site Fill Tan Light Grey Sandy Clay 2) On -Site Fill Tan Brown Sandy Clay 3) On -Site Fill Tan Sand with Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 101 .0 pcf 16.0% Moisture 2) 107.0 pcf 16.0% Moisture 3) 113.0 pcf 12.0% Moisture LOCATION DATE: 27 July 1994 MOISTURE DRY PERCENT REQUIRED PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION PCF BELOW Backfill Over Sanitary Sewer Service Lines SUBGRADE 32) Lot 1 1 3' 16.7 102.3 101.3 95+ 33) Lot 1 2 1' 18.7 102.0 95.3 Optimum 2% 34) Lot 3 2 2' 18.1 106.2 99.3 35) Lot 3 2 1' 18.1 106.1 99.2 36) Lot 6 2 3' 16.2 105.4 99.4 37) Lot 8 1 2.5' 18.7 97.3 96.3 38) Lot 10 2 2.5' 17.4 107.2 100.2 39) Lot 12 2 2.5' 18.9 102.6 95.9 Backfill Over Storm Sewer Line B 40) approx. Station 2+00 1 1' 14.9 96.6 95.6 Backfill Over Storm Sewer Line A 41) approx. Station 0 +30 3 Fin. Sub. 13.3 110.3 97.6 TECHNICIAN: CDJ DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg (1) C. W. Young Construction (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 AL., (214) 351 -6419 Fax (214) 351 -5148