Loading...
Grand Cove-LR 940719Hooper Engineering Laboratories, Inc. Construction Materials Testing CLIENT: Frank Bamburg Building Co. LOCATION TECHNICIAN: CDJ REPORT OF IN -PLACE DENSITY TESTS PROJECT: Grand Cove Estates, Coppell, TX JOB NO.: 94.1075 MATERIAL DESCRIPTION: 1) On -Site Fill Tan Sand with Grey Clay 2) On -Site Fill Tan Brown Sandy Clay 3) On -Site Fill Tan Light Grey Sandy Clay ASTM D 698 STANDARD PROCTOR: 1) 113.0 pcf 1 2.0% Moisture 2) 107.0 pcf 16.0% Moisture 3) 101.0 pcf 16.0% Moisture DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg (1) C. W. Young Construction (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 DATE: 19 July 1994 MOISTURE DRY PERCENT REQUIRED PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION PCF BELOW Backfill Over Sanitary Sewer Line A SUBGRADE 13) approx. Station 0 +50 1 6' 14.1 112.3 99.4 95+ 14) approx. Station 0 +50 1 4' 13.7 108.2 95.8 Optimum 2% 15) approx. Station 0 +50 2 2' 17.5 104.5 97.7 16) approx. Station 0 +50 3 10' 14.4 100.1 99.1 17) approx. Station 0 +50 3 8' 16.1 97.7 96.7 (214) 351 -6419 Fax (214) 351 -5148