Loading...
Grand Cove-LR 940714CLIENT: Frank Bamburg Building Co. PROJECT: Grand Cove Estates, Coppell, TX JOB NO.: 94.1075 MATERIAL DESCRIPTION: 1) On -Site Fill Tan Brown Sandy Clay 2) On -Site Fill Tan Sand with Grey Sandy Clay 3) On -Site Fill Tan Light Grey Sandy Clay ASTM D 698 STANDARD PROCTOR: 1) 107.0 pcf 16.0% Moisture 2) 113.0 pcf 12.0% Moisture 3) 101 .0 pcf 16.0% Moisture LOCATION BELOW Backfill Over Sanitary Sewer Line A SUBGRADE 1) approx. Station 3 +50 1 6' 17.0 103.1 96.4 95 2) approx. Station 3 +50 1 4' 18.3 102.5 95.8 Optimum 2% 3) approx. Station 3 +50 2 2' 13.9 112.2 99.3 4) approx. Station 3 +50 3 1' 18.6 99.9 98.9 TECHNICIAN: CDJ Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN -PLACE DENSITY TESTS DISTRIBUTION: (1) Frank Bamburg Building Co., Frank Bamburg (1) C. W. Young Construction (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 DATE: 14 July 1994 MOISTURE DRY PERCENT REQUIRED PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION PCF (214) 351 -6419 Fax (214) 351 -5148