Villages of CC 4-LR 930410Hooper Engineering Laboratories, Inc. Construction Materials Testing CORING OF HARDENED CONCRETE FOR DEPTH CLIENT: Jim Sowell Construction Co., Inc. DATE: 10 April 1993 PROJECT: Village at Cottonwood Creek, Sec. IV JOB NO.: 92.1079 Coppell, TX SAMPLES: 4" Diameter cores were taken by a representative of Hooper Engineering Laboratories, Inc. on 4/8/93 and 4/10/93 to verify depth of concrete. METHOD OF TEST: ASTM C42 -90 and C174 -87 SPECIFICATION CORE NO. CORE LENGTH REQUIREMENTS 1 6.0" 6" 2 6.2" 6" 3 6.2" 6" 4 6.2" 6" 5 6.1" 6" 6 5.9" `* 6" 7 6.5" 6" 8 6.9" 6" 9 5.9" 10 5.1 "�� 11 5.6" 12 6.1" 6" 13 6.5" 6" 14 5.3" / k9`'t fP 15 5.7" 16 6.5" 6" 17 6.3" 1 /1 6" 18 5.1 ^ ** +�11� 6" 19 6.1" 20 7.3" 6" 21 6.2" 6" 22 5.6 .* g „ 23 5.2" 24 5.8" • 25 7.8" 6" 26 6.3" 6" 27 28 6.3" 5.4" A 29 5.6" 30 31 6.3" 5.4 " (91�J 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Jim Sowell Construction Co., Inc. Village at Cottonwood Creek, Section IV, Coppell Coring of Hardened Concrete for Depth Page Two 10 April 1993 SPECIFICATION CORE NO. CORE LENGTH REQUIREMENTS 32 6.2" 6" 33 6.4" 6" 34 5.8" 35 5.9" 36 6.3" 6" 37 6.6" 6" 38 5.5" ^ 39 5.0" * * `y A - 6" 40 5.2" 41 6.9" 6" 42 6.4" 6" 43 n 4.1 " 44 5.5" 45 5.2" 46 6.0" 47 5.8" *6 " -4 " -6" (3600 psi); 7.5 "- 4.5 " -7.5" (3000 psi) * *Does not comply with project specification requirements. LOCATIONS OF CORES: 1 - Graham Drive @ Station 1 + 50, 5' east of west curb 2 - Graham Drive @ Station 4 +40, 5' west of east curb 3 - Graham Drive @ Station 7 + 50, 5' east of west curb 4 - Graham Drive @ Station 10+65, 5' north of south curb 5 - Graham Drive @ Station 13 + 85, 5' south of north curb 6 - Graham Drive @ Station 17 +00, 5' north of south curb 7 - Gibson Court @ Station 3 +30, 5' east of west curb 8 - Gibson Court @ Station 6 + 40, 5.5' west of east curb 9 - Alley E @ Station 0 + 85, 2.5' north of south side r' o - Alley E @ Station 3 + 75, 2.5' east of west side 1 1 Alley E @ Station 6 + 55, 2.5' north of south side 12 - Hampton Court @ Station 4 + 30, 5' east of west curb 13 - Hampton Court @ Station 1 + 25, 5' west of east curb i4 - Alley D @ Station 3+70, 2.5' west of east side 15 - Alley D @ Station 6+50, 2.5' north of south side 16 - Fairview Court @ Station 4 + 50, 5' west of east curb 17 - Fairview Court @ Station 1 + 55, 5.5' east of west curb Alley C @ Station 3+55, 2.5' west of east side 9 - Alley C @ Station 6+47, 2.5' south of north side 20 - Buttonwood Court @ Station 6 + 10, 5' east of west curb 21 - Buttonwood Court @ Station 3 + 15, 5' west of east curb 22 - Drexel Drive @ Station 6 + 80, 5' north of south curb Alley B @ Station 4 + 00, 2.5' west of east side 4 - Alley B @ Station 0 + 95, 2.5' south of north side 25 - Bricknell Drive @ Station 0 + 70, 5' east of west curb 26 - Bricknell Drive @ Station 3 +80, 5' west of east curb ""04J Jim Sowell Construction Co., Inc. Village at Cottonwood Creek, Section IV, Coppell Coring of Hardened Concrete for Depth Page Three 10 April 1993 LOCATIONS OF CORES: 27- Alley A @ Station 10 + 10, 2.5' west of east side Alley A @ Station 7 + 20, 2.5' north of south side 29- Alley A @ Station 4 + 10, 2.5' east of west side 3- Alley F, 2.5' south of north side, 50' east of curb at Gibson Court Alley F, 2.5' west of east side, 80' north of Graham Drive curb 32 - Gifford Drive, 5.5' east of west curb, 50' north of Graham Drive curb 33 - Gifford Drive, 5.5' west of east curb, 90' south of north curb 34 - Alley G, 2.5' east of west side, 120' north of south curb 35 - Alley G, 2.5' north of south side, 55' west of east curb 36 - Matheson Court, 5.5' west of east curb, 135' south of north curb at cul de sac 37 - Matheson Court, 5.5' east of west curb, 40' north of south curb at Graham Alley H, 2.5' south of north side, 80' east of west curb at Matheson 1= Alley J, 90' north of Alley H, 2.5' west of east side 40 - Alley J, 50' west of Sheffield Court, 2' north of south side 41 - Sheffield Court, 20' south of north curb, 20' east of west curb 42 - Sheffield Court, 90' west of Graham Drive, 8' south of north curb (g- Alley K, 30' south of north end, 3' west of east side 44- Alley H, 80' south of Sheffield Court, 2' east of west side 45- Alley L, 60' east of Graham Drive, 2' south of north side 46 - Alley L, 200' north of south end, 2' east of west side 47 - Alley M, 80' east of west end, 2' south of north side NOTE: All core depths and concrete strengths should be reviewed by project engineer for acceptance. TECHNICIAN: MS /GKO (8:OOam- 7:OOpm 4/8/93) GKO/LS (7:30am- 3:OOpm 4/10/93) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. z4mc. (1) The Nelson Corporation (1) Mario Sinacola & Sons Excavating, Inc. (1) City of Coppell, Garreth Campbell R- Im