Loading...
Villages of CC 4-LR 930315Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 92.1079 CLIENT: Jim Sowell Construction Co., Inc. DATE: 15 March 1993 PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix LOCATION OF POUR SET 1: Paving leaveout around drain inlets on east and west side of Gifford Drive approx. 100' south of Parkway Blvd. LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 4700 Truck No. 102 Cement Ticket No. 16133 Flyash Time Batched 9:38am Sand Time Sampled 10:10am in. Concrete Temp. (ASTM C1064) 57 °F 1.0 in. Air Content (ASTM 0231) 5.2% Water Unit Weight (ASTM C1381 Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM c39) (Standard 6 inch x 12 inc cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 197 3.00 7 03/22/93 122,400 4330 198 3.00 7 03/22/93 120,400 4260 199 3.00 28 04/12/93 150,000 5300 200 3.00 28 04/12/93 148,100 5240 28 -Day Average 5270 3000 TECHNICIAN: LS (9:30am- 11:00am) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell 1 r 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 92.1079 CLIENT: Jim Sowell Construction Co., Inc. DATE: 15 March 1993 PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix LOCATION OF POUR SET 1: Paving leaveout around drain inlets on east and west side of Gifford Drive approx. 100' south of Parkway Blvd. LOCATION OF POUR SET 2: SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM c1064) Air Content (ASTM C231) Unit Weight (ASTM C138) SET 1 SET 2 102 16133 9:38am 10:10am 57 °F 5.2% MIX NO. 4700 Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cy linder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 197 3.00 7 03/22/93 122,400 198 3.00 7 03/22/93 120,400 199 3.00 28 04/12/93 200 3.00 28 04/12/93 TECHNICIAN: LS (9:30am- 11:00am) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell 28 -Day Average 4330 4260 3000 1 r/ r