Loading...
Villages of CC 4-LR 930305Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Jim Sowell Construction Co., Inc. PROJECT: Village at Cottonwood Creek Sec. IV, Coppell LOCATION OF POUR SET 1: Inlet tops on Gibson Court LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 115 Cement Ticket No. 15621 Flyash Time Batched 10:26am Sand Time Sampled 11:20am in. Concrete Temp. (ASTM C10641 60 °F 1.0 in. Air Content 1ASTM C231) 3.4% Water Unit Weight 1ASTM 0138) Admix #1 Admix #2 AEA JOB NO.: 92.1079 DATE: 5 March 1993 SUPPLIER: Redi -Mix 4700 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 189 3.00 7 03/12/93 102,800 3640 190 3.00 7 03/12/93 100,100 3540 191 3.00 28 04/02/93 192 3.00 28 04/02/93 28 -Day Average TECHNICIAN: REM (10:45am- 12:30pm) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell 3000 r 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 92.1079 CLIENT: Jim Sowell Construction Co., Inc. DATE: 5 March 1993 PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix LOCATION OF POUR SET 1: Inlet tops on Gibson Court LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 4700 Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content (ASTM 0231) Unit Weight (ASTM C138) 115 15621 10:26am 1 1:20am 60 °F 3.4% Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 189 3.00 7 03/12/93 102,800 3640 190 3.00 7 03/12/93 100,100 3540 191 3.00 28 04/02/93 135,300 4790 192 3.00 28 04/02/93 137,300 4860 28 -Day Average 4830 3000 TECHNICIAN: REM (10:45am- 12:30pm) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell r r 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148