Villages of CC 4-LR 930305Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Jim Sowell Construction Co., Inc.
PROJECT: Village at Cottonwood Creek Sec. IV, Coppell
LOCATION OF POUR SET 1: Inlet tops on Gibson Court
LOCATION OF POUR SET 2:
SAMPLE DATA:
SET 1 SET 2
MIX NO.
Truck No.
115
Cement
Ticket No.
15621
Flyash
Time Batched
10:26am
Sand
Time Sampled
11:20am
in.
Concrete Temp. (ASTM C10641
60 °F
1.0 in.
Air Content 1ASTM C231)
3.4%
Water
Unit Weight 1ASTM 0138)
Admix #1
Admix #2
AEA
JOB NO.: 92.1079
DATE: 5 March 1993
SUPPLIER: Redi -Mix
4700
COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28 -Day
(ASTM C143) psi Strength
189
3.00
7
03/12/93 102,800 3640
190
3.00
7
03/12/93 100,100 3540
191
3.00
28
04/02/93
192
3.00
28
04/02/93
28 -Day Average
TECHNICIAN: REM (10:45am- 12:30pm)
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Conatser Construction Co.
(1) City of Coppell, Garreth Campbell
3000
r
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 92.1079
CLIENT: Jim Sowell Construction Co., Inc. DATE: 5 March 1993
PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix
LOCATION OF POUR SET 1: Inlet tops on Gibson Court
LOCATION OF POUR SET 2:
SAMPLE DATA:
SET 1 SET 2
MIX NO. 4700
Truck No.
Ticket No.
Time Batched
Time Sampled
Concrete Temp. (ASTM C1064)
Air Content (ASTM 0231)
Unit Weight (ASTM C138)
115
15621
10:26am
1 1:20am
60 °F
3.4%
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder
Slump
Age
Test
Total Load
Compressive
Required
Number
Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
psi
Strength
189
3.00
7
03/12/93
102,800
3640
190
3.00
7
03/12/93
100,100
3540
191
3.00
28
04/02/93
135,300
4790
192
3.00
28
04/02/93
137,300
4860
28 -Day Average 4830 3000
TECHNICIAN: REM (10:45am- 12:30pm)
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Conatser Construction Co.
(1) City of Coppell, Garreth Campbell
r r
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148