Loading...
Villages of CC 4-LR 930227Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Jim Sowell Construction Co., Inc. PROJECT: Village at Cottonwood Creek Sec. IV, Coppell LOCATION OF POUR SET 1: Inlet tops on Drexel Drive LOCATION OF POUR SET 2: SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content (ASTM C231) Unit Weight (ASTM C138) SET 1 SET 2 MIX NO. 143 Cement 15468 Flyash 9:33am Sand 10:00am in. 58 °F 1.0 in. 3.0% Water 28 Admix #1 Admix #2 AEA JOB NO.: 92.1079 DATE: 27 February 1993 SUPPLIER: Redi -Mix 4700 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 - Day (ASTM C143) psi Strength 185 2.00 7 03/06/93 186 2.00 7 03/06/93 187 2.00 28 03/27/93 188 2.00 28 03/27/93 TECHNICIAN: REM (9:00am- 11:00am) 132,500 4690 132,200 4680 28 -Day Average 3000 4&�A*j 1, *fit DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Jim Sowell Construction Co., Inc. PROJECT: Village at Cottonwood Creek Sec. IV, Coppell LOCATION OF POUR SET 1: Inlet tops on Drexel Drive LOCATION OF POUR SET 2: SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content IASTM C231) Unit Weight (ASTM C138) SET 1 SET 2 143 15468 9:33am 10:00am 58 ° F 3.0% JOB NO.: 92.1079 DATE: 27 February 1993 SUPPLIER: Redi -Mix MIX NO. 4700 Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 185 2.00 7 03/06/93 132,500 4690 186 2.00 7 03/06/93 132,200 4680 187 2.00 28 03/27/93 163,800 5790 188 2.00 28 03/27/93 158,600 5610 28 -Day Average 5700 3000 1, IAP�t TECHNICIAN: REM (9:00am- 11:00am) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148