Villages of CC 4-LR 930118Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.:
CLIENT: Jim Sowell Construction Co., Inc. DATE:
PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER
LOCATION OF POUR SET 1: Paving, Sheffield Court @ Station 4 +40
10' east of west curb
LOCATION OF POUR SET 2:
SAMPLE DATA:
SET 1 SET 2
MIX NO.
Truck No.
106
Cement
Ticket No.
01/25/93
Flyash
Time Batched
10:15am
Sand
Time Sampled
10:20am
in.
Concrete Temp. (ASTM C1064)
64 °F
1.0 in.
Air Content (ASTM 0231)
4.3%
Water
Unit Weight (ASTM C138)
147.9
Admix #1
Admix #2
AEA
92.1079
18 January 1993
Mario Sinacola
COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28 -Day
(ASTM C143) psi Strength
105
4.00
7
01/25/93
106
4.00
7
01/25/93
107
4.00
28
02/15/93
108
4.00
28
02/15/93
TECHNICIAN: MS (9:30am- 11:30am)
111,500 3940
108,100 3820
28 -Day Average
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Mario Sinacola & Sons Excavating, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419
3000
Fax (214) 351 -5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CoNeREET€ TESTS
CLIENT: Jim_S.awO Construction C Inc.
PROJEC Village at Cottonwood Creek Sic'; IV, Coppell
LOCATIO UR SET 1: Paving, Matheson Court @ Station
15' west of east curb
LOCATION OF POUR SET 2:
JOB NO.: 92.1079
DATE: 18 January 1993
SUPPLIER: Mario Sinacola
SAMPLE DATA:
SET 1
SET 2
MIX NO.
Truck No.
Cement
Ticket No.
Flyash
Time Batched
1:25pm
Sand
JAN
L 6
Time Sampled
1:30pm
in.
Concrete Temp. (ASTM C1084)
64 °F
1.0 in.
Air Content (ASTM C231)
4.2%
Water
Unit Weight (ASTM C138)
148.2
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C391
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump
Age
Test
Total Load
Compressive
Required
Number Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
psi
Strength
109 4.25
7
01/25/93
114,400
4050
110 4.25
7
01/25/93
107,300
3790
111 4.25
28
02/15/93
112 4.25
28
02/15/93
28 -Day Average
TECHNICIAN: MS (1:00pm- 2:30pm)
3000
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Mario Sinacola & Sons Excavating, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419
Fax (214) 351 -5148