Loading...
Villages of CC 4-LR 930106Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF SOIL GRADATIONS CLIENT: Jim Sowell Construction Co., Inc. DATE: 6 January 1993 PROJECT: Village at Cottonwood Creek Section IV, JOB NO.: 92.1079 Coppell, TX SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc. on 1/6/93. TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation /vAtA.-O (1) Mario Sinacola & Sons Excavating, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 PERCENT PASSING SPECIFICATION LOCATION NO. 4 SIEVE REQUIREMENTS 25) Alley J Station 1+00 64.8 60 + 26) Station 4 +00 68.5 Alley H 27) Station 4+50 64.0 Alley L 28) Station 6+50 60.3 29) Station 3+50 60.2 30) Station 0+50 62.4 Sheffield Ct. 31) Station 1 + 00 65.3 32) Station 4 +00 66.4 Alley K 33) Station 3 + 25 68.2 34) Station 0 + 45 65.4 TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation /vAtA.-O (1) Mario Sinacola & Sons Excavating, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN -PLACE DENSITY TESTS CLIENT: Jim Sowell Construction Co., Inc. DATE: 6 January 1993 PROJECT: Village at Cottonwood Creek, Sec. IV, Coppell JOB NO.: 92.1079 MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Brown Clayey Sand with Lime 2) On -Site Fill - Reddish Brown Clayey Sand 3) On -Site Fill - Brown & Orange Sand 4) Lime Stabilized Subgrade - Brown & Tan Sandy Clay with Lime ASTM D 698 STANDARD PROCTOR: 1) 1 12.0 pcf @ 13.0% Moisture 2) 118.0 pcf @ 12.0% Moisture 3) 119.0 pcf @ 11.0% Moisture 4) 106.0 pcf @ 16.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % 255) Graham Drive Station 1+00 1 Fin. Sub. 16.8 111.3 99.4 95+ 256) Station 4 +00 1 Fin. Sub. 14.0 109.5 97.6 -2% to +4% 257) Station 7 +00 1 Fin. Sub. 16.3 111.3 99.4 Of Optimum 258) Station 10 +00 1 Fin. Sub. 13.6 113.9 101.7 259) Alley H Station 1+00 2 Fin. Sub. 13.6 114.0 96.6 260) Alle Station 5+00 2 Fin. Sub. 14.9 112.1 95.0 261) Station 2+00 3 Fin. Sub. 11.0 123.2 103.5 262) Alley F Station 1 +00 3 Fin. Sub. 11.5 114.4 96.1 263) Station 4 +00 3 Fin. Sub. 11.5 120.4 101.2 264) Alley E Station 1+00 3 Fin. Sub. 11.4 122.8 103.2 265) Station 4 +00 3 Fin. Sub. 10.6 114.4 96.1 266) Station 6+50 3 Fin. Sub. 10.9 120.8 101.5 Alley M 267) Station 2 +00 4 Fin. Sub. 17.1 105.8 99.8 287o walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Jim Sowell Construction Co., Inc. Village of Cottonwood Creek Sec. IV In -Place Density Tests Page Two 6 January 1993 LOCATION MOISTURE Alley H 268) Station 4 + 00 PROCTOR Alley J 269) Station 4 + 00 270) Station 1+00 Alley K 271) Station 3+25 272) Station 0+25 1 Alley L 273) Station 6+50 274) Station 3+50 275) Station 0+50 Sheffield Court 276) Station 1 + 00 277) Middle of cul -de -sac Page Two 6 January 1993 TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Mario Sinacola & Sons Excavating, Inc. (1) City of Coppell, Garreth Campbell r. MOISTURE DRY PERCENT REQUIRED PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % 1 Fin. Sub. 14.1 112.8 100.7 95+ -2% to +4% Of Optimum 1 Fin. Sub. 15.3 112.3 100.3 4 Fin. Sub. 20.1 105.7 99.7 1 Fin. Sub. 15.4 111.0 99.1 1 Fin. Sub. 15.6 110.6 98.8 1 Fin. Sub. 16.0 109.6 97.9 4 Fin. Sub. 17.4 105.8 99.8 1 Fin. Sub. 16.6 108.6 97.0 1 Fin. Sub. 16.7 110.2 98.4 1 Fin. Sub. 16.1 110.6 98.8 TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Mario Sinacola & Sons Excavating, Inc. (1) City of Coppell, Garreth Campbell r.