Loading...
Villages of CC 4-LR 930105Hooper Engineering Laboratories, Inc. Construction Materials Testing JAN REPORT OF SOIL GRADATIONS CLIENT: Jim Sowell Construction Co., Inc. DATE: 5 January 1993 PROJECT: Village at Cottonwood Creek Section IV, JOB NO.: 92.1079 Coppell, TX SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc. on 1/5/93- LOCATION PERCENT PASSING NO. 4 SIEVE SPECIFICATION REQUIREMENTS 72.0 68.5 69.5 67.7 63.4 60.1 64.2 64.3 61.2 63.6 66.7 70.7 65.8 TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Mario Sinacola & Sons Excavating, Inc. (1) City of Coppell, Garreth Campbell [-Tom 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Alley A 12) Station 10 +00 13) Station 7+00 14) Station 4+00 15) Station 1+00 Alley C 16) Station 6+34 17) Station 3+50 18) Station 1+00 Alley D 19) Station 6+00 20) Station 3+00 Graham Drive 21) Station 1+00 22) Station 4 + 00 23) Station 7+00 24) Station 10+00 72.0 68.5 69.5 67.7 63.4 60.1 64.2 64.3 61.2 63.6 66.7 70.7 65.8 TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Mario Sinacola & Sons Excavating, Inc. (1) City of Coppell, Garreth Campbell [-Tom 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN -PLACE DENSITY TESTS CLIENT: Jim Sowell Construction Co., Inc. DATE: 5 January 1993 PROJECT: Village at Cottonwood Creek, Sec. IV, Coppell JOB NO.: 92.1079 MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Brown Clayey Sand with Lime 2) Lime Stabilized Subgrade - Brown & Tan Sandy Clay with Lime ASTM D 698 STANDARD PROCTOR: 1) 112.0 pcf @ 13.0% Moisture 2) 106.0 pcf @ 16.0% Moisture TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Constriuction Co., Inc. (1) The Nelson Corporation (1) Mario Sinacola & Sons Excavating, Ind. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % 245) Alley A Station 1+00 1 Fin. Sub. 16.2 111.0 99.1 95+ 246) Station 4 +00 2 Fin. Sub. 18.8 105.3 99.3 247) Station 7 +00 2 Fin. Sub. 18.2 107.8 101.8 248) Station 10 +00 1 Fin. Sub. 16.7 112.2: 100.2 Alley C 249) Station 6+50 1 Fin. Sub. 15.9 109.7 97.9 250) Station 3 + 50 1 Fin. Sub. 15.4 109.1 97.4 251) Station 0 + 50 1 Fin. Sub. 16.8 110.0 98.2 Alley D 252) Station 6 +28 2 Fin. Sub. 19.8 104.9 98.9 253) Station 3+50 2 Fin. Sub. 19.6 106.7 100.6 ., A, f% . c-7 7 Fin Suh_ 17.9. 106.2 100.2 TECHNICIAN: CDJ DISTRIBUTION: (1) Jim Sowell Constriuction Co., Inc. (1) The Nelson Corporation (1) Mario Sinacola & Sons Excavating, Ind. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148