Villages of CC 4-LR 921110Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 92.1079
CLIENT: Jim Sowell Construction Co., Inc. DATE: 10 November 1992
PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix
LOCATION OF POUR SET 1: Two storm drain inlets at Drexel Drive
LOCATION OF POUR SET 2:
SAMPLE DATA:
SET 1 SET 2
MIX NO. 0404
Truck No.
129
Cement
Ticket No.
92730
Flyash
Time Batched
1:22pm
Sand
Time Sampled
2:05pm
in.
Concrete Temp. IASTM C10e4)
75 °F
1.0 in.
Air Content (ASTM C231)
3.50
Water
Unit Weight 1ASTM C13s)
170,600
Admix #1
Admix #2
AEA
CO MPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inc x 12 inch cyli nder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28 -Day
(ASTM C143) psi Strength
9
3.50
7
11/17/92
139,000
4920
10
3.50
7
11/17/92
127,800
4520
11
3.50
28
12/08/92
162,500
5750
12
3.50
28
12/08/92
170,600
6030
28 -Day Average 5890
TECHNICIAN: MFM (1:30pm- 3:00pm)
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Conatser Construction Co.
(1) City of Coppell, Garreth Campbell
CAM
�r r
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 92.1079
CLIENT: Jim Sowell Construction Co., Inc. DATE: 10 November 1992
PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix
LOCATION OF POUR SET 1: Two storm drain inlets at Drexel Drive
LOCATION OF POUR SET 2:
SAMPLE DATA:
SET 1
SET 2
MIX NO.
0404
Truck No.
129
Cement
Ticket No.
92730
Flyash
Time Batched
1:22pm
Sand
Time Sampled
2:05pm
in.
Concrete Temp. (ASTM C10641
75 °F
1.0 in.
Air Content (ASTM 0231)
Water
Unit Weight (ASTM c138)
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump
Age
Test
Total Load
Compressive
Required
Number Inches
Days
Date
Pounds
Strength
28 -Day
(ASTM C143)
psi
Strength
9 3.50
7
11/17/92
139,000
4920
10 3.50
7
11/17/92
127,800
4520
11 3.50
28
12/08/92
12 3.50
28
12/08/92
28 -Day Average
TECHNICIAN: MFM (1:30pm- 3:00pm)
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Conatser Construction Co.
(1) City of Coppell, Garreth Campbell
3000
�r r
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148