Loading...
Villages of CC 4-LR 921110Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 92.1079 CLIENT: Jim Sowell Construction Co., Inc. DATE: 10 November 1992 PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix LOCATION OF POUR SET 1: Two storm drain inlets at Drexel Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 0404 Truck No. 129 Cement Ticket No. 92730 Flyash Time Batched 1:22pm Sand Time Sampled 2:05pm in. Concrete Temp. IASTM C10e4) 75 °F 1.0 in. Air Content (ASTM C231) 3.50 Water Unit Weight 1ASTM C13s) 170,600 Admix #1 Admix #2 AEA CO MPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inc x 12 inch cyli nder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 9 3.50 7 11/17/92 139,000 4920 10 3.50 7 11/17/92 127,800 4520 11 3.50 28 12/08/92 162,500 5750 12 3.50 28 12/08/92 170,600 6030 28 -Day Average 5890 TECHNICIAN: MFM (1:30pm- 3:00pm) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell CAM �r r 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 92.1079 CLIENT: Jim Sowell Construction Co., Inc. DATE: 10 November 1992 PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix LOCATION OF POUR SET 1: Two storm drain inlets at Drexel Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 0404 Truck No. 129 Cement Ticket No. 92730 Flyash Time Batched 1:22pm Sand Time Sampled 2:05pm in. Concrete Temp. (ASTM C10641 75 °F 1.0 in. Air Content (ASTM 0231) Water Unit Weight (ASTM c138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 9 3.50 7 11/17/92 139,000 4920 10 3.50 7 11/17/92 127,800 4520 11 3.50 28 12/08/92 12 3.50 28 12/08/92 28 -Day Average TECHNICIAN: MFM (1:30pm- 3:00pm) DISTRIBUTION: (1) Jim Sowell Construction Co., Inc. (1) The Nelson Corporation (1) Conatser Construction Co. (1) City of Coppell, Garreth Campbell 3000 �r r 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148