Villages of CC 4-LR 921103Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 92.1079
CLIENT: Jim Sowell Construction Co., Inc. DATE: 3 November 1992
PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix
LOCATION OF POUR SET 1: Two storm drain inlets, Gibson Court, north end,
both sides of street
LOCATION OF POUR SET 2:
SAMPLE DATA:
Truck No.
Ticket No.
Time Batched
Time Sampled
Concrete Temp. (ASTM C1064)
Air Content (ASTM c231)
Unit Weight (ASTM C138)
SET 1 SET 2
124
92364
3:05pm
3:20pm
72 °F
MIX NO. 0404
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch c
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28 -Day
(ASTM C143) psi Strength
1 4.25
7
11/10/92 101,100
2 4.25
7
11/10/92 104,100
3 4.25
28
12/01/92
4 4.25
28
12/01/92
TECHNICIAN: MFM (2:30pm- 4:30pm)
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Conatser Construction Co.
(1) City of Coppell, Garreth Campbell
28 -Day Average
3580
3680
3000
W9 J
2870 Walnut Full Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 92.1079
CLIENT: Jim Sowell Construction Co., Inc. DATE: 3 November 1992
PROJECT: Village at Cottonwood Creek Sec. IV, Coppell SUPPLIER: Redi -Mix
LOCATION OF POUR SET 1: Two storm drain inlets, Gibson Court, north end,
both sides of street
LOCATION OF POUR SET 2:
SAMPLE DATA:
Truck No.
Ticket No.
Time Batched
Time Sampled
Concrete Temp. (ASTM c10641
Air Content (ASTM C231)
Unit Weight (ASTM C1381
SET 1 SET 2
124
92364
3:05pm
3:20pm
72 ° F
MIX NO. 0404
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28 -Day
(ASTM C143) psi Strength
1 4.25
7
11/10/92
101,100
3580
2 4.25
7
11/10/92
104,100
3680
3 4.25
28
12/01/92
134,900
4770
4 4.25
28
12/01/92
135,200
4780
TECHNICIAN: MFM (2:30pm- 4:30pm)
DISTRIBUTION: (1) Jim Sowell Construction Co., Inc.
(1) The Nelson Corporation
(1) Conatser Construction Co.
(1) City of Coppell, Garreth Campbell
28 -Day Average 4780
3000
V11 - -- N
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148