Villages of CC 4-LR 920827Hooper Engineering Laboratories, Inc.
2670 Walnut Hill Lane Dallas , Texas 75229 (214) 351.6419
Client :
Jim Sowell
Constriction Co. ,
Inc. ,
Date:
27 August 1992
Project •
Village at
Cottonwood Creek,
Sec. IV,
Job. No:
92.1079
Boil Description : Borrow Fill (fran site west of Vista Ridge)
Tan Sandy Clay
Maximum Density : 105.0 pcf Liquid Limit : 40.6
Optimum Moisture : 16.0% Plasticity Index : 30.7
Distribution : (1) Jim Sowell Construction Co. , Inc.
(1) The Nelson Corporation
(1) James B. Amold Construction, Inc.
(1) Mario Sinacola & Sons Excavating, Inc.
(1) City of Coppell, Larry Davis
0
0
r-
V
7
V
L
a
v
C
n
0
CL
N
C
L
i'
110
90
80
5 15 25
Moisture Content - percent