Villages of CC 4-CS 920811Jim Sowell Company
4809 Cole Avenue, Suite 250
Dallas, Texas 75205 -3523
214'522 -3739
FAX: 2141;520-0347
August 11, 1992
Mr. Alan Johnson
Assistant Finance Director
CITY OF COPPELL
255 Parkway Blvd.
Coppell, Texas 75019
Re: Villages of Cottonwood Creek Section IV
Development Fee Assessment
Dear Mr. Griffin:
Herewith is a check in the amount of $171,678.20 for Development Fees in reference to the
Village of Cottonwood Creek Section IV. This check includes payment of the following:
1. Park Fee (50 %) $ 11
2. Water Impact Fee (100 %) 98,800.00
3. Wastewater Impact Fee (100 %) 34,200.00
4. Street Sign Fee (100 %) 3,116.29
5. Construction Inspection Fee (100 %) 24,161.91
TOTAL $171.678.20
This check was issued based on information provided by Robert Finley with The Nelson
Corporation, a copy of which is attached.
If we can be of further service, please call.
Sincerely,
JIM SOWELL CONSTRUCTION CO., INC.
isa A. Cain
/lc
encls.
cc: Gary Sieb
Kenneth Griffin
Larry Davis