Loading...
Villages of CC 4-CS 920811Jim Sowell Company 4809 Cole Avenue, Suite 250 Dallas, Texas 75205 -3523 214'522 -3739 FAX: 2141;520-0347 August 11, 1992 Mr. Alan Johnson Assistant Finance Director CITY OF COPPELL 255 Parkway Blvd. Coppell, Texas 75019 Re: Villages of Cottonwood Creek Section IV Development Fee Assessment Dear Mr. Griffin: Herewith is a check in the amount of $171,678.20 for Development Fees in reference to the Village of Cottonwood Creek Section IV. This check includes payment of the following: 1. Park Fee (50 %) $ 11 2. Water Impact Fee (100 %) 98,800.00 3. Wastewater Impact Fee (100 %) 34,200.00 4. Street Sign Fee (100 %) 3,116.29 5. Construction Inspection Fee (100 %) 24,161.91 TOTAL $171.678.20 This check was issued based on information provided by Robert Finley with The Nelson Corporation, a copy of which is attached. If we can be of further service, please call. Sincerely, JIM SOWELL CONSTRUCTION CO., INC. isa A. Cain /lc encls. cc: Gary Sieb Kenneth Griffin Larry Davis