Villages of CC 4-CS 920603��
�9
A Beautiful Future
Mr. Tim Welch
The Nelson Corporation
5999 Summerside Drive, #202
Dallas, TX 75252
Re: Villages of Cottonwood Creek Section IV
Development Fee Assessment
Dear Mr. Welch:
P.O. Box 478
Coppell, Texas 75019
214- 462 -0022
We are enclosing a copy of the City of Coppell Development Fee Assessment
list along with copies of the development fee calculations for the
Villages of Cottonwood Creek Section IV to the City of Coppell.
Please provide a check made payable to the City of Coppell in the amount
of $147,516.29 and forward it to Mr. Alan Johnson, Assistant Finance
Director, along with a copy of the Fee Assessment list. In addition,
please provide our office with a copy of your Engineer's Estimate for this
project or contract amount for verification of the construction inspection
fee.
Please provide a copy of your paid receipt to our offices. Copies of your
receipts will help us verify payment of the required fees and assure a
successful beginning of this project.
We look forward to working with you on this project. If you have any
questions, please do no hesitate to contact me.
Sincerely,
Ken eth M. Griffin, P.E.
City Engineer
cc: Gary Sieb b Director of Public of Planning and Community Services
Steve ram, Works
Ala ohnson, Assistant Finance Director
ry Davis, Engineering Development Inspector
COTTDEV
June 3, 1992
CITY OF COPPELL
DEVELOPMENT FEES
Date: June 3, 1992
Project: Villages of Cottonwood Creek Section
IV
Amount Due
Prior to
Total
Council
Assessment
Approval
Park Fee
$22,800.00
$ 11,400.00
(50% payable prior to Council Approval)
(50% payable with Building Permit)
Water Impact Fee
$98,800.00
$ 98,800.00
(100% due prior to Council Approval)
Water Tap Inspection Fee
$15,200.00
$ - 0 -
(100% due at Issuance of Building Permit)
Wastewater Impact Fee
$34,200.00
$ 34,200.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
$15,200.00
$ - 0 -
(100% due at Issuance of Building Permit)
Street Sign Fee
$ 3,116.29
$ 3,116.29
(100% due prior to Council Approval)
Street Light Fee
*
�`
(100% due prior to Council Approval)
Construction Inspection Fee
(100% due prior to Council Approval)
(Based on 2% of project construction
cost to be provided by the
Developer's Engineer)
TOTALS
K
TOTAL AMOUNT DUE PRIOR
TO COUNCIL APPROVAL:
$147,516.29
Plus 2%
Construction
Inspection Fee
* This fee cannot be assessed until after TU Electric submits the lighting
plan for the proposed project. Once the plan is submitted, $292.60 per
light will be assessed.
COTTDEl
�i i?LY,,Jlv.[.
COPPELL PUBLIC WORKS
MEMORANDUM
JUN -
By. Engineering
DATE: May 28, 1992
TO: Ken Griffin, City Engineer
FROM: Howard Pafford, Utilities Superintendent
RE: Development Fees for Villages at Cottonwood Creek
Section IV
The following fees should be assessed on the above referenced
project.
Water Impact Fee: (Does not include Irrigation)
152 - 518" x 314" Domestic Meter /s = 152 ESU's
Irrigation Meter /s = ESU's
Fireline Meter /s = ESU's
Total 152 ESU's @ $650.00 ea = $98,800.00
100% due prior to Council approval of final plat.
* There will be water impact fees on the irrigation meters.
Wastewater Impact Fee: (MUD)
152 - 518" x 314"
Domestic Meter /s =
152
ESU's
@ $225.00
= $34,200.00
100% due prior
to Council approval
of
final
plat.
Water Tap Inspection Fee
152 Connections @ $100.00 each = $15,200.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
152 Connections @ $100.00 each = $15,200.00
100% due prior to issuance of building permit.
Street Lighting Pee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Pee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Pee
152 Residential Lots at $150.00 each = $22,800.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
ALP /mp
cc: Steven G. Goram, Director of Public Works
DEVELPE4.HLP
STREET SIGN ASSESSMENT
for Villages at Cottonwood Creek Section IV
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN
UNIT PRICE
QUANTITY
EXTENDED PRICE
No Parking
$ 53.10
Speed Limit
$ 63.54
31
$1,969.74
Yield
$ 58.56
Stop
$ 65.12
Street Name
$ 11.60
1
11.60
Stop & Street
Combo $ 96.85
11
1,065.35
OTHER
No Outlet
$ 11.60
6
$ 69.60
TOTAL
$3,116.29
* Cost breakdowns may be obtained from Public Works by written
request.
Revised 5128192