Loading...
Villages of CC 4-CS 930525COPPELL PUBLIC WORKS MEMORANDUM DATE: May 25, 1993 TO: Garreth Campbell, Construction Inspector FROM: Howard L. Pafford, Utilities Superintendent RE: Walk - Through Punch - List for Cotton Wood Creek Estates Phase IV (Water /Sanitary Sewer) problems have been corrected with the exception of the following: 1� 1. Sta. 10 + 20.28 - No rise from cone top. * 2. Sta. 0 + 00 Line B - No rise from cone top. q 3. Sta. 0 + 00 Line C - Repair inflow into manhole invert. 3 p 4. Matheson Drive - Mainline valve under concrete. Additionally, there are two (2) manhole connections on this project that are improperly installed. All connections to existing manholes must be core drilled and sealed with cor -n seal and blocked with concrete. The two connections that were made on this project fail to meet these standards; therefore, it is necessary to excavate and pour in 3 feet x 2 feet concrete encasement on outside of connection. It will be necessary to stabilize this blockout and have construction inspector inspect the repair. Please ensure that each of these items are corrected prior to acceptance of this project. If you have any questions, please advise. HLP /dm cc: Steven G. Goram, Director of Public Works COTNWOD2HLP