Loading...
CF-Justice Center-LR 960821jam` ~i~ a~ ATEC Associates, Inc. ~ . ~~ °~ 11356 Mathis Avenue ~, Dallas, Texas 75229 c~ F ~ 2 '( NFL (214)556-2204 ` METRO 263-1681 y~g~ ~7 ~y5, y~ s ~(iF.blso s -~Jii~iS~ REPORT OF CONCRETE COMPRESSION TEST Project: Coppel Justice Center Date Sampled: 08/21/96 Client: City of Coppell Our Report No: 25-02-96-00068.SOA Field Test Data Location of Pour when Sampled: Sidewalk - 4' N and 2' E of S Column at Entrance Way to Building, NW Comer Contractor Mid South Supplier/Plant: Mid Cities Ready Mix Sampled By: J. Travis Delivery Ticket No.: 18059 Time: Batched: 12:04pm Sampled: 1:OOpm Truck Number: 444 Temperature: Air: 94°F Concrete: 90°F Load Size: 10 cu.yds. Slump: 5 in. Air Content: 4.8 % Mix 1D No.: 9351 Water Added on site: -- gals. Compressive Strength Test Results Specimen Type: Cubes 6" x 12" 3'esl Method: ASTM C-39, ASTM C-1231 X AS'TM C-6I7 Set No. Specimen No. ,Type Curh~g Date Tested Age Days Failure Load, lbs. Specimen'Area (sq. ln.} Compressive Strength, PSi 1 3513 lab OS-28 7 81,400 28.27 2,880 1 3514 Lab 09-18 28 119,340 28.27 4,220 1 3515 Lab 09-18 28 110,760 28.27 3,920 1 3516 Lab 09-18 28 SPECIFIED STRENGTH 28 3,000 Remarks: Cylinder diamter = b.00 unless noted otherwise. Respectfully submitted, This report represents only the materials tested and may oi~nay not be~representative of identical or similar materials. This report shall not be reproduced except in its entirety and with the express written permission of ATEC Associates, Inc.