Loading...
CF-Justice Center-LR 960501ya3~ ATEC Associates, Inc . 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO (214) 263-1681 FIELD DENSITY TESTS Project Na^ie: Criminal Justice Center Client Name: City of Coppell General Contractor: Mid South ATEC Job No.: 25-02-%-00068.29 Date: 05/01/% Test Moisture % Dry Density_ Proctor %-of Proctor Pass Fail Fait Elevakion/ Location No. (PCF) No. Spec Actual Compaction Moisture Refer F.G_ Grid Coordinates or Roadway Station 1 21.2 100.2 *12701 95 101.2 X Final Town Center - 4" electrical, Station 3+10, south lane centerline 2 22.4 84.3 12701 95 85.2 X 2nd Lift/ -1.0' Town Center - 4" electrical, Station 3+10, south bound lane 5'E centerline 3 24.0 84.3 12701 95 85.2 X 2nd Lift/ -1.0' Town Center - 4" electrical, Station 3+10, south bound, 8'E centerline Test/De th 1/6" 2/6" 3/6" Moisture Std. Count Densit Std. Count Gauge Number/Model Density Count 2724 4242 4092 654 2821 24085/3430 Moisture Count 248 222 237 Wet Density (PCF) 121.5 103.2 104.6 Test Method Moisture (PCF) 21.3 18.9 20.3 ASTM: D2922, Direct Transmission _X_ Back Scatter ASTM: D3017 (1) Test Location Established by: Grid Lines Control Points X_ Estimation (2) Depth or Elev. of Test Established by: Survey _ _ Grade Stakes _ Estimation (3) Test Conducted on: Full Time Basis Intermittent Basis X Proctor No. Maximum Density (PCF) Opt. Moisture (%) Std. Proctor *12701 99.0 22.1 X Remarks: *New sample p/u proctor Note: Subcontractor-Llano Construction, notified of failing test ATEC REPRESENTATIVE: J. Restau This report represents only the materials tested and may or may not be representative of identical or similar materials. This report shall not be reproducedexcept in its _ Contractor _X_ Contractor _ Mod. Proctor Visual Description Brown Silty Clav written permission of ATEC Associates, Inc.