Loading...
CF-Justice Center-LR 960220ATEC Associates, Inc. 11356 Mathis Avenue Datlas, Texas 75229 (214) 556-2204 METRO 263-1681 REPORT OF CONCRETE COMPRESSION TEST Project: Coppell Justice Center Date Sampled: 02-20-96 Client: City of Coppell Our Report No: 25-02-95-00068. lOH Field Test Data Location of Pour when Sampled: Piers C-3.4, C-2.7, C-1.9 & D-2.7 Contractor MidSouth Supplier/Plant: Redi-Mix Sampled By: E. Finney Delivery Ticket No.: 98469 Tune: Batched: 1:47 Sampled 2:20 Truck Number: 110 Load Size: 9 cu. yds Temperature: Air: 82°F Concrete 78°F Mix ID No.: 723 Sltunp: 4.75 in. Air Content ---46 Water Added on site: 5 gals. Compressive Strength Test Results Speeinxn Type:.Cyts. 6" X.12" Test Method: AS1M C-39, ASTM C-1211 X ASTM C-617 Set No. Specimen No. Type Curing Date Tested Age Days Failure Load, Ibs. Specimen Area (sq. inJ Compressive Strength, PSI 1 9264 Lab 02-27 7 98,380 28.27 3,480 1 9265 Lab 03-19 28 138,920 28.27 4,910 1 9266 Lab 03-19 28 130,860 28.27 4,630 1 9267 Lab 03-19 Hold SPECIFIED STRENGTH 28 3,~ emar s~ .v in er Iameter = ln. un ess noted otherwise. Respectfully submitted, ,/ ~ ~~ ~-~ v - , l ~~ „_ This report represents only the materials tested and may or may not be representative of identical or similar materials. This report shall not be reproduced except in its entirety and with the express written permission of ATEC Associates, Inc.