Loading...
Belt Line Trade-CS070329 THE.CITY.OF corrELL .-. *~. eJ( '" I!>q .-\ 8 . 1 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING From: Ken Griffin, P .E., Dir. of Engineering I Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Fire Marshal j/l Larry Davis, Construction Inspector ~ Office Phone: (972) 304-3684 Fax: (972) 304-3570 To: Date: March 29, 2007 RE: W ALK- THRU INSPECTION Belt Line Trade Center, Lot 1 Block 1 A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for: Wednesday, April 4, 2007 at 2:00 p.m. Please let me know if I can be of further assistance. cc: Ryan Bell, Raymond Construction fax #972-980-6770 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"