Loading...
Service Star-CS070329 THE.CITY.OF corrELL 8 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING From: Ken Griffin, P .E., Dir. of Engineering I Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Fire Marshal ~ Larry Davis, Construction Inspector ~ p-- Office Phone: (972) 304-3684 Fax: (972) 304-3570 To: Date: March 29, 2007 RE: W ALK- THRU INSPECTION Vista Point II, Lot 4 Phase 1 (Firestone Store) A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for: Wednesday, April 4, 2007 at 9:00 a.m. Please let me know if I can be of further assistance. cc: Tim Robitaille, ICI Construction fax #972-866-0197 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"