Coppell Trade 2-LR070221;..:....
,....
11440 Reeder Rd. • Dallas, TX 75229
FAR.OO CONSULTANTS, IxO. Tel. (214) 352-4100 • Fax (214) 352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07
PROJECT: Coppell Trade Center Building D Project No.: M06-1165
Coppell, Texas
CONCRETE INFORMATION
CONTRACTOR: Mcfadden and Miller
TICKET NO.: 42500 CONCRETE SUPPLIER: Txz
AMBIENT TEMP.(°F): 52 PLANT/TRUCK: 141 / 841
CONCRETE TEMP.(°F): 60 MIX ID NUMBER: 8205
TIME BATCHED: 6:40 a.m. AIR(%): 4.2 (ASTMC231)
TIME SAMPLED: 7 :20 a.m. WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (inches): 5 1 /2 (ASTM C 743)
LOCATION OF PLACEMENT: Paving strip, 15' S by 15' W from SE building corner
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
i DESIGN STRENGTH OF CONCRETE (4000 psil 28 days )
CYLINDER
NUMBER AGE
(Days) DATE
TESTED TOTAL LOAD
(pounds) COMPRESSIVE
STRENGTH
si Percent of Design Strength
(%) 'i
1A 7 2 28 07 101 670 3600 90~
1B 28 3 21 07 127 920 4520 113
1C 28 3 21 07 126 870 4490 112
1D Hold
Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39)
Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39)
Remarks:
Technician: D Dj ikine
Distribution:
Holt Lansford Commercial - Ken Newman
Mcfadden & Miller - Jon Jacobson
City of Coppell - Larry Davis
FARGO CONSULTANTS, INC.
Checked by:
Gary Moor C.E.T.
CMT Manager
Geotechnica! Engineering i Construction Materials Testing i Environmental Services
www. dallasfargo. com
i
11440 Reeder Rd. • Dallas, TX 75229
___ __ -
P`AR.CiO OOFBULTANTS, INC. Tel. (214) 352-4100 • Fax (214) 352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07
PROJECT: Coppell Trade Center Building D Project NO.: M06-1165
Coppell, Texas
CONCRETE INFORMATION
CONTRACTOR: Mc f adden and Mi 11 er
TICKET NO.: 42516 CONCRETE SUPPLIER: Txz
AMBIENT TEMP.(°F): 55 PLANT/TRUCK: 141 / 64
CONCRETE TEMP.(°F): 68 MIX ID NUMBER: 8205
TIME BATCHED: 8 : 06 a.m. AIR (%): 4.1 (ASTM C 231)
TIME SAMPLED: 8: 50 a.m. WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (inches): 4 (ASTM C 143)
LOCATION OF PLACEMENT: Paving, 15' S by 140'w from SE building corner
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
DESIGN STRENGTH OF CONCRETE (4000 psi/ 28 days )
CYLINDER
NUMBER AGE
(Days) DATE
TESTED TOTAL LOAD
(pounds) COMPRESSIVE
STRENGTH
si Percent of Design Strength
(%)
2A 7 2 28 07 103 240 3650 91~
2B 28 3 21 07 127 880 4520 113
2C 28 3 21 07 128 790 4560 114$
2D Hold
Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39)
Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39)
Remarks:
Technician: D Dj ikine
Distribution:
Holt Lansford Commercial - Ken Newman
Mcfadden & Miller - Jon Jacobson
City of Coppell - Larry Davis
FARGO CONSULTANTS, INC.
Checked by:
Gary Moore C.E.T.
CMT Manager
Geotechnica/ Engineering i Construction Materials Testing i Environmental Services
www.dallasfargo.com
11440 Reeder Rd. • Dallas, TX 75229
-- - -
FA&(i0 OON8ULTANTB, IIJO. Tel. (214) 352-4100 • Fax (214) 352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07
PROJECT: Coppell Trade Center Building D Project No.: M06-1165
Coppell, Texas
CONCRETE INFORMATION
CONTRACTOR: Mcfadden and Miller
TICKET NO.: 42546 CONCRETE SUPPLIER: Txz
AMBIENT TEMP.(°F): 65 PLANTITRUCK: 141 / 69
CONCRETE TEMP.(°F): 73 MIX ID NUMBER: 8205
TIME BATCHED: 11:31 a . m. AIR (%): 4.2 (ASTM C 231)
TIME SAMPLED: 12 :20 p.m. WATER ADDED (gal): 0
WEATHER CONDITION: Clear SLUMP (inches): 5 (ASTM C 143)
LOCATION OF PLACEMENT: Paving strip, 15' S by 300' W from SE building corner
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
DESIGN STRENGTH OF CONCRETE (4000 pail 28 days )
CYLINDER
NUMBER AGE
(Days) DATE
TESTED TOTAL LOAD
(pounds) COMPRESSIVE
STRENGTH
si Percent of Design Strength
(%)
3A 7 2 28 07 92 320 3270 82~
3B 28 3 21 07 119 080 4210 105
3C 28 3 21 07 120 050 4250 106
3D Hold
Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39)
Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39)
Remarks:
Technician: D Dj ikine
Distribution:
Holt Lansford Commercial - Ken Newman
Mcfadden & Miller - Jon Jacobson
City of Coppell - Larry Davis
FARGO CONSULTANTS, INC.
Checked by:
Gary Moor C.E.T.
CMT Manager
Geotechnical Engineering i Construction Materials Testing ~ Environmental Services
www, dallasfargo. com
_.
,....
,....
F
~ ... r,~
' 11440 Reeder Rd. • Dallas, TX _75229
FARCiU OON~ULTANTS, INC. Tel. (214) 352-4100 • Fax (214) 352-4811
CONCRETE COMPRESSIVE STRENGTH REPORT
CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07
PROJECT: Coppell Trade Center Building D Project No.: M06-1165
Coppell, Texas
CONCRETE INFORMATION
CONTRACTOR: Mcfadden and Miller
TICKET NO.: 42568
AMBIENT TEMP.(°F): 70
CONCRETE TEMP.(°F): 75
TIME BATCHED: 1:45 p.m.
TIME SAMPLED: 2 : 30 p.m.
WEATHER CONDITION: Clear
LOCATION OF PLACEMENT: Paving strip, 15' S
CONCRETE SUPPLIER: TXI
PLANT/TRUCK:141 / 802
MIX ID NUMBER: 8205
AIR (%): 4 . 1 (ASTM C 231)
WATER ADDED (gal): o
SLUMP (inches): 5 1 /2 (ASTM C 143)
by 100'W from SE building corner
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
DESIGN STRENGTH OF CONCRETE (4000 psil 28 days )
CYLINDER
NUMBER AGE
(Days) DATE
TESTED TOTAL LOAD
(pounds) COMPRESSIVE
STRENGTH
si Percent of Design Strength
(°k)
4A 7 2 28 07 92 320 3270 82~
4B 28 3 21 07 115 090 4070 102
4C 28 3 21 07 115 570 4090 102
4D Hold
Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39)
Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39)
Remarks:
Technician: D Dj ikine
Distribution:
Holt Lansford Commercial - Ken Newman
Mcfadden & Miller - Jon Jacobson
City of Coppell - Larry Davis
FARGO CONSULTANTS, INC.
Checked by:
Gary Moor C.E.T.
CMT Manager
Geotechnical Engineering i Construction Materials Testing i Environmental Services