Loading...
Coppell Trade 2-LR070221;..:.... ,.... 11440 Reeder Rd. • Dallas, TX 75229 FAR.OO CONSULTANTS, IxO. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 42500 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F): 52 PLANT/TRUCK: 141 / 841 CONCRETE TEMP.(°F): 60 MIX ID NUMBER: 8205 TIME BATCHED: 6:40 a.m. AIR(%): 4.2 (ASTMC231) TIME SAMPLED: 7 :20 a.m. WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches): 5 1 /2 (ASTM C 743) LOCATION OF PLACEMENT: Paving strip, 15' S by 15' W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS i DESIGN STRENGTH OF CONCRETE (4000 psil 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 'i 1A 7 2 28 07 101 670 3600 90~ 1B 28 3 21 07 127 920 4520 113 1C 28 3 21 07 126 870 4490 112 1D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnica! Engineering i Construction Materials Testing i Environmental Services www. dallasfargo. com i 11440 Reeder Rd. • Dallas, TX 75229 ___ __ - P`AR.CiO OOFBULTANTS, INC. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07 PROJECT: Coppell Trade Center Building D Project NO.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mc f adden and Mi 11 er TICKET NO.: 42516 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F): 55 PLANT/TRUCK: 141 / 64 CONCRETE TEMP.(°F): 68 MIX ID NUMBER: 8205 TIME BATCHED: 8 : 06 a.m. AIR (%): 4.1 (ASTM C 231) TIME SAMPLED: 8: 50 a.m. WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches): 4 (ASTM C 143) LOCATION OF PLACEMENT: Paving, 15' S by 140'w from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (4000 psi/ 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 2A 7 2 28 07 103 240 3650 91~ 2B 28 3 21 07 127 880 4520 113 2C 28 3 21 07 128 790 4560 114$ 2D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moore C.E.T. CMT Manager Geotechnica/ Engineering i Construction Materials Testing i Environmental Services www.dallasfargo.com 11440 Reeder Rd. • Dallas, TX 75229 -- - - FA&(i0 OON8ULTANTB, IIJO. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 42546 CONCRETE SUPPLIER: Txz AMBIENT TEMP.(°F): 65 PLANTITRUCK: 141 / 69 CONCRETE TEMP.(°F): 73 MIX ID NUMBER: 8205 TIME BATCHED: 11:31 a . m. AIR (%): 4.2 (ASTM C 231) TIME SAMPLED: 12 :20 p.m. WATER ADDED (gal): 0 WEATHER CONDITION: Clear SLUMP (inches): 5 (ASTM C 143) LOCATION OF PLACEMENT: Paving strip, 15' S by 300' W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (4000 pail 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (%) 3A 7 2 28 07 92 320 3270 82~ 3B 28 3 21 07 119 080 4210 105 3C 28 3 21 07 120 050 4250 106 3D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing ~ Environmental Services www, dallasfargo. com _. ,.... ,.... F ~ ... r,~ ' 11440 Reeder Rd. • Dallas, TX _75229 FARCiU OON~ULTANTS, INC. Tel. (214) 352-4100 • Fax (214) 352-4811 CONCRETE COMPRESSIVE STRENGTH REPORT CLIENT: Holt Lunsford Commercial Sample Date: 02/21/07 PROJECT: Coppell Trade Center Building D Project No.: M06-1165 Coppell, Texas CONCRETE INFORMATION CONTRACTOR: Mcfadden and Miller TICKET NO.: 42568 AMBIENT TEMP.(°F): 70 CONCRETE TEMP.(°F): 75 TIME BATCHED: 1:45 p.m. TIME SAMPLED: 2 : 30 p.m. WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving strip, 15' S CONCRETE SUPPLIER: TXI PLANT/TRUCK:141 / 802 MIX ID NUMBER: 8205 AIR (%): 4 . 1 (ASTM C 231) WATER ADDED (gal): o SLUMP (inches): 5 1 /2 (ASTM C 143) by 100'W from SE building corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS DESIGN STRENGTH OF CONCRETE (4000 psil 28 days ) CYLINDER NUMBER AGE (Days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH si Percent of Design Strength (°k) 4A 7 2 28 07 92 320 3270 82~ 4B 28 3 21 07 115 090 4070 102 4C 28 3 21 07 115 570 4090 102 4D Hold Cylinders Type: Nominal Cylinder Size 6"X12" (ASTM C 39) Specifications: Making and curing (ASTM C 31) Testing Methods (ASTM C 39) Remarks: Technician: D Dj ikine Distribution: Holt Lansford Commercial - Ken Newman Mcfadden & Miller - Jon Jacobson City of Coppell - Larry Davis FARGO CONSULTANTS, INC. Checked by: Gary Moor C.E.T. CMT Manager Geotechnical Engineering i Construction Materials Testing i Environmental Services www. dallasfargo. com