Loading...
ST0301-CN070405 .. FREESE' NICHOLS &fJd ~f ff f0)~<d- STD3-tJl CONTRACTCHANGEAUTHOR~nONFORM Client: City of Coooell 255 Parkway Blvd CODDeIl. Texas 75019 Attn: Ken Griffin F&N Project No.: CPL03243 Amendment'2 Date: December 15, 2006 Project Deecrlptlon: Bethel & Cappell Road Paving & Utility Improvements Deecrtptlon of Servtc.. AddedJDeteted: A. Intersection Schematic . Prepare an intersection schematic plan for the new roadway into the proposed Senior Center across from Hearthstone and the improvements to Park Lane. The plan will include a left turn lane from Bethel into the Senior Center and a large radius on the right turn side. . Review drainage plan to make accommodations for the new roadway and the modifications to Park Lane. . Utilizing the survey data provided by BW2 Engineers (civil engineer for the Senior Center project), flag trees that will need to be removed either to accommodate the proposed improvements and/or due to visibility issues. . Stake location of proposed curb lines for the Hearthstone intersection prior to a meeting with the City to assist with review of the proposed plan by the various City departments and the Senior Center design consultants. . Deltverables: 1. Five copies of plan view intersection schematics. 2. Field staking/flagging as described. Includes one day of field work only. . Additional Fee: Additional Lump Sum Fee of $14,600 B. Revise plan sheets. . Revise paving plan and profiles, drainage area map, drainage design plans. . Detail the turn lane improvements and provide construction details for the medians. . Add a plan and profile sheet for Park Lane improvements. . Produce cross sections for the Park Lane improvements. . This intersection will not be signalized. . Coordinate design drawings with the Senior Center design consultants. . Deltverables: Revised plans will be incorporated in the project as we finalize the plans for construction. Completion of the drawings from the current 90% level will be done as directed by the City based on the City's schedule for this bond project. . AddItIonal Fee: Additional Lump Sum Fee of $23,800 Compenutlon shall be adjusted .. follows: Amendment t2 Amount $508,300 $53,140 $38,400 Original Contract Amendment" 1 Amount 1701 No MARKET 'TREET.SUlTt! lOt . DALLAl, Tl!XAI 71112 · TELEPHONE: 21......_. fAX: 21.......... U:'FCIllMSlCONfIVlCT\CONTRACT CHAHOl! fteQUl!ST.DOC I Revised Total Contract I $599,840 Schedule shall be adjusted as follows: Phase A -Intersection schematic will be completed by January 12th or &artier. Phase B - Plans will be revised and taken to 100% upon notice-to-proceed by the City. We anticipate this phase taking approximately 6 weeks to complete. The deliverable dates wiN be discussed in more detail as the date for completion approaches. The above deacrlb<<J services .hall proceed upon retum of this Contract a..ng. Authorization. ServIcea will be billed.. they are cIotHI. All other provisions, """'., and condltlon8 of the agtHIfHHJt for servlc.. which.. not expr888ly amended shall remain In full force and .tfect This Contract Change Authorization will serve as contract modifICation. :~U:IC~Lir;t1r TITLE:~t;; rJ DATE: -----11..- 20- rYo BY: ~,... TITLE: DATE: 1701 No IlAMl!T STItEI!!T, SUTl! lOt · DALLAS, T1XA17at2 · TELeJIHONI!: 11......,.... fAX: 21........ U:~CHI\NOI!REQlJI!ST.DOC FREESE' NICHOLS . Q" il .--UJ ~J'0 _.:,tl~// \\.l~Jl ~. W L-\\ CO NT ~ bole! ~ !~:j ~ .. CT CHANGE AUTHORIZATION FORM Client: City of Coppell 255 Parkway Blvd Coppell. Texas 75019 Attn: Ken Griffin F&N Project No.: CPL03243 Amendment #2 Date: December 15, 2006 Project Description: Bethel & Coppell Road Paving & Utility Improvements Description of Services Added/Deleted: A. Intersection Schematic · Prepare an intersection schematic plan for the new roadway into the proposed Senior Center across from Hearthstone and the improvements to Park Lane. The plan will include a left turn lane from Bethel into the Senior Center and a large radius on the right turn side. · Review drainage plan to make accommodations for the new roadway and the modifications to Park Lane. · Utilizing the survey data provided by BW2 Engineers (civil engineer for the Senior Center project), flag trees that will need to be removed either to accommodate the proposed improvements and/or due to visibility issues. · Stake location of proposed curb lines for the Hearthstone intersection prior to a meeting with the City to assist with review of the proposed plan by the various City departments and the Senior Center design consultants. · Oeliverables: 1. Five copies of plan view intersection schematics. 2. Field staking/flagging as described. Includes one day of field work only. · Additional Fee: Additional Lump Sum Fee of $14,600 B. Revise plan sheets. · Revise paving plan and profiles, drainage area map, drainage design plans. · Detail the turn lane improvements and provide construction details for the medians. · Add a plan and profile sheet for Park Lane improvements. · Produce cross sections for the Park Lane improvements. · This intersection will not be signalized. · Coordinate design drawings with the Senior Center design consultants. · Oeliverables: Revised plans will be incorporated in the project as we finalize the plans for construction. Completion of the drawings from the current 90% level will be done as directed by the City based on the City's schedule for this bond project. · Additional Fee: Additional Lump Sum Fee of $23,800 Compensation shall be adjusted as follows: Original Contract Amendment # 1 Amount $508,300 Amendment #2 Amount $53,140 $38,400 1701 N. MARKET STREET, SUITE 500 · DALLAS, TEXAS 75202 . TELEPHONE: 214-920-2500' FAX: 214-920-2565 U:\FORMSICONTRACTICONTRACT CHANGE REQUEST. DOC Page 1 of2 Clay Ifwe are a go on the access location and the widening of Bethel Road, I need to process a change order to Freese & Nichols contract to revise the plans. I attached their proposal for the scope change in the amount of $38,400. Let me know if I can proceed with the amendment to the contract. Thanks keng >>> "Tricia Hatley" <thh@freese.com> 3/27/2007 10:20:04 AM >>> Ken, I just received this email from the civil engineer on the Senior Center project. I didn't want to respond to his questions without talking with you first and I'm not sure where you are at on this project. We've got some options ready for you to review when you are ready. I'm assuming that you would like to review them prior to any discussions with their civil engineer. Let me know how you want me to move forward on this. Trish Tricia Hatley Freese and Nichols, Inc. Main: 214.920.2500 Direct: 214.217.2217 -----Original Message----- From: Jim Waldbauer [mailto:jwaldbauer@bw2inc.com] Sent: Tuesday, March 27,2007 10:32 AM To: Tricia Hatley Subject: Coppell- Bethel Road Trish As you know, we're working with an architect on the Coppell Senior Center site and we know that you all are working on Bethel Road. The architect's concept plan appears to now have been accepted and we are getting ready to move forward with design work. I just wanted to get up to speed on some of the Bethel Road issues with you, especially regarding the widening of Bethel for the turn lane into the Senior Center, timing of improvements, etc. Let me know what you think and we can discuss further. Jim file:/ /C:\Documents%20and%20Settings\PCROCKER\Local%20Settings\Temp\GW} 0000... 3/30/2007