Loading...
Gateway BP(3.1)-LR070317Client: Transwestern Conunercial Services Report No.: 279369 Mr. Ric Nelson Project No.: 0712786 I'ranswestern Commercial Services Date of Service: 02/21/2007 5001 Spring Valley Rd., Ste 600W Report Date: 03/17/2007 Dallas TX 75244 Project: Gateway $usiness Center Coppell, Texas Services: Perform In-Place Density 'l'est in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Constructors & Associates Standard Counts FestMethods: ~ Gauge: 'hroxler 3430 Moisture Densi ASTM D-922 tY AS"I'M D-3017 Gauge Serial No: 355] 8 Current-. 745 Current: 2550 Test mode: DT Previous: 742 Previous: 242 MOISTURE llENSITY RELATIONS Maximum Project Requirements NUD No. Descriptio^ Moisture % Densit~° pcf Aoisture Density 1 Tannish Brown Silty Clay 2~.5 93.5 Minimum +4 92-96 2 Dark Brown Ciay 27.0 89.G Minimum -~ 4 92-96 TEST NO TEST LOCATION PROBE DEPTH M/D MOISTURE No. (%) WET DENSITY DRP DENSITY (pcf) (pcf) DENSITY (% max) Fill 1 Building pad 2, southwest corner, 25' north, 6" 1 32.] 117.3 88.8 95 35' east. 5th lift Fill 2 Building pad 2, southwest corner, 25' north, 6" 1 31.5 116.9 88.9 95 70' east, 5th lift Fill 3 Building pad 2. southwest corner, 25' north. 6" 1 31,7 116.7 88.6 95 110' east. 5th lift Fill 4 Building pad 2, southwest corner, 75' north, 6" 1 32.2 116.1 87.8 94 35' east. nth lift LIMITAT]ONS: The test results presented herein were prepared based upon the specific samples prodded for testine. We assume no responsibility for variation in quality (composition, appearance, ete.l or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineerine Services, Ltd. o7Th1 Page l of 2 `" - .~., F~ 2eport ~'o.: 29.69 ?roject No.: 0 712756 Client: Trans~~~estern Commercial Sen~ices -~-~-~ ~° I'ECT PROSI: '11/D D10ISTURE ~'~~E"T DENSITY D RY DENSITY DENSITY ?r0 TF,ST LOCATION DEPTH No. (%) (pct (pct) (% max) Fill 5 Building pad 2, southwest corner, 75' north, 6" 1 34.4 116.8 86.9 93 70' east. 5th lift Fill 6 Building pad 2, southwest corner. 75' north, 6" 1 33.2 116.7 87.6 94 110' east. 5th lift Fill 7 Building pad 2, northwest corner, 25' south, 6" 1 33.7 116.7 87.3 93 35' east. 5th lift Fill 8 Building pad 2, northwest corner, 25' south, 6" ] 32.4 116.8 88.2 94 70' east. 5th lift Fill 9 Building pad 2, northwest corner, 25' north, 6" 2 3l .8 111.9 84.9 95 1 l0' east. 5th lift Fill l0 Building pad 2, northwest corner, 75' north, 6" 2 35.2 111.0 82.1 92 35' east. 5th lift Fill I 1 Building pad ?, northwest corner, 75' north, 6" 2 32.2 111.8 84.6 95 70' east, nth lift Fill l 2 Building pad ?, northwest corner. 75' north. 6" 2 32.2 110.9 83.9 94 110' east. 5th lift Test results on thi s report m eet project specification. Rg ~IiE~I' ~-~ Technician: Joe Jernigan Started: 2:OOpm Finished: 4:30pm / /' Report Distribution: / (1) Transwestern Commercial Services (1) Murray Construction Co, ]nc. (1) City of Coppell (1) Aztec Environmental ~ - l~lChael COX, SET (1) City of Coppell Project Manager (1) Constructors LPvIITATIONS: 'the test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appe-arance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. )'T114 Page 2 of 2 ,- 89f)8 Ambassador Row, Dallas. TX 71247 7701 ~~'. Little York, Suite 600, Houston, 'IX 77040 4221 Freidrich Lane, Suite 195, Austin, Tk 78744 Corporate Phone: (817) 284-1318 IN-PLACE DENSITY TESTING Client: Transwestern Corrnnercial Services Report No.: 279030 Mr. Ric Nelson Project No.: 0712786 Transwestern Commercial Services Date of Service: 02/19/2007 ~OOI Spring Valley Rd., Ste 600W Report Date: 03/17/2007 llallas TX 75244 Project: Gateway Business Center Coppell, Texas Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CO'VTRACTOR: Constructors & Associates Standard Counts Test Methods: ~7 Gauge: TroYler 3430 Moisture Density ASTM D-29__ .ASTMD-3017 GaugeScriallVo:35~18 Current: 741 Current: 2537 Test Mode: DT Previous: 744 Previous: 2531 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density ] Tannish Brown Silty Clay 24.5 93.5 Minimum +4 92-96 TEST NO 'TEST LOCATION PROBE DEPTH M/D MOISTUKE No. (%) WET DENSITY DRY DENSITY (pcf) (pci) DENSITY (% max) Fill 1 Building pad 2, southwest corner, 25' north. 6" 1 31.3 l 16.1 88.4 95 3S east, subgrade Fill 2 Building pad 2, southwest corner, 25' north, 6" 1 3 l .6 116.6 88.6 95 70' east, subgrade Fill 3 Building pad 2, southwest corner, 25' north, 6" l 32.1 117.3 88.8 95 110' east. subgrade Fill 4 Building pad 2, southwest corner. 75' north, 6" 1 31.5 116.9 88.9 95 3 ~' east, subgrade Fill 5 Building pad 2, southwest corner, 75' north, 6" 1 31.7 116.7 88.6 95 70' east, subgrade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. V1e assume no responsibility for variation in quality (composition. appearance, etc.l or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the ~~~ritten approval of Rone Eneineerine Services, Ltd. 17Tnq Page 1 of 2 Report !~o.: ~,-°li~U Project No.: 0?1??86 Client: Transwestern Commercial Services ,~.. ~~ -~u°`. TEST PROSE '1I/D A1vISTtiRE YET DENSITY D RI' DENSITY DENSITY Np TEST LOCATION DEPTIi No. (%) (pcf) (pcf) (% max} Fiil 6 Building pad Z, south«~est corner, 75' north. 6" 1 322 116.1 87.8 44 110' east, subgrade Fill 7 Building pad 2, northwest corner, 25' south, 6" 1 34.4 116.8 86.9 93 3 S east, subgrade Fill 8 Building pad 2; northwest corner, 25' south, 6" 1 33.2 116.7 87.6 94 70' east, subgrade Fill 9 Building pad 2, northwest corner, 25' south, 6" 1 33.7 116.7 87.3 93 110' east. subgrade Fill l0 Building pad 2. northwest corner, 75' south, 6" 1 32.4 116.8 882 94 35' east., subgrade Fill 1 1 Building pad 2, northwest corner, 75' south, 6" 1 33.0 116.4 87.5 94 70' east. subgrade Fill 12 Building pad 2, northwest corner, 75' south, 6" 1 3l .4 116.4 88.6 95 1 10' east. subgrade Test results on thi s report meet proje ct specification. Technician: toe Jernigap Started: 9:45a Finished: 12:0 Report Distribution: (l j Transwestern Commercial Services (I) Murray Construction Co, Inc. (lj City of Coppell (1 j ~yztec Environmental ~ %MlChae~ COX, SET (Ij City of Coppell ~,/f Project Manager (1) Constructors LII~%[ITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc) or any other feature of similar subject matter provided b} persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not he reproduced except in full without the written approval of Rone Engineering Services, Ltd. t-T'1I Page 2 of 2 Rt~~n '' 'fi Op~-~~ i ~~~ 8908 Ambassador Row, Dallas, TX 75247 7701 «'. Little Fork, Suite 600, Houston, TX 77040 422] Freidrich Lane, Suite 195, Austin, TX 78744 Corporate Phone: (817) 284-1318 IN-PLACE DENSITY TESTING Client: Transwestern Commercial Services Report No.: 279035 Mr. Ric Nelson Project No.: 0712786 Transwestern Commercial Services Date of Service: 02/19/2007 5001 Spring Valley Rd., Ste 600W Report Date: 03/17/2007 Dallas TX 75244 Project: Gateway Business Center Coppell, Texas Servlees: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Constructors & Associates Standard Counts Test Methods: ~ 7 Gauge: Troxler 3430 Moisture Density ASTM D-~92_ ASTM D-3017 Gauge Serial No: 35518 Current: 741 Current: 2537 Test Mode: DT Previous: 744 Previous: 2531 MOISTURE DENSITY RELATIONS Maximum Project Requirements 'VIID No. Description Dloisture °/ Density pcf Moisture Density 1 Tannish Brown Silty Clay 24.5 93.5 Minimum +4 92-96 TEST NO TEST LOCATION PROBE DEPTH M/D MOISTURT No. (%) Vb'ET DENSITY DRY DENSITY (pcf) (pct) DENSITY (% max) Fill 1 Building pad 2, southwest corner.. 25' north, 6" 1 31.3 116.] 88.4 95 35' east, 1 st lift Fill 2 Building pad 2, southwest corner, 25' north, 6" 1_ 31.6 116.6 88.6 95 70' east, 1st lift Fill 3 Building pad 2, southwest corner, 25' north. 6" 1 32. i 117.3 88.8 95 110' east, 1st lift Fill 4 Building pad 2, southwest corner, 75' north, 6" 1 31.5 116.9 88.9 95 3 5' east, 1st lift Fill 5 Building pad 2, southwest corner, 7S north, 6" 1 31.7 116.7 88.6 95 70' east, 1st lift LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Eneineering Services, Ltd. 'TDI Page 1 of 2 t~eport 'o.: ? y03~ .~.. .~ ~ ~'.~z roject No.: 0712786 Client: Transwestern Commercial Services 7~EST PROBE n1/D A70ISTGRE ~VI;T DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. (%) (pct) (pcf) (% max) Fill 6 Building pad 2, southwest corner, 75' north, 6" l 32.2 116.1 87.8 94 1 10' east, l st lift Fill 7 Building pad 2, northwest corner, 25' south, 6" l 34.4 116.8 86.9 93 35' east. 1st lift Fill 8 Building pad 2, northwest corner. 25' south.. 6" 1 33.2 116.7 87.6 94 70' east. 1 st lift Fill 9 Building pad 2, northwest corner, 25' south, 6" 1 33.7 116.7 87.3 93 110' east, 1st lift Fill 10 Building pad 2, northwest corner, 75' south, 6" 1 32.4 116.8 88.2 94 35' east, 1st lift Fill 1 l Building pad 2, northwest corner, 75' south. 6" 1 33.0 116.4 87.5 94 70' east. ] st lift Fill 12 Building pad 2, northwest confer, 75' south. 6" 1 31.4 116.4 88.6 95 110' east, 1 st lift Test results on this report meet project specification. Technician: Joe Jerni an Started: ~_ g '''15m Finished: ~~ 4:OOpm ~ Ro n ~ in Report Distribution: i C I i M C ~` ` urray onstruct on o, nc. ces (1 j (1) Transtiwestern Commercial Serv L ~-;- ~ (1)City of Coppell (1 j Aztec Environmental ~ ~ M1Ch3e1 COX, SET (1) City of Coppel I ~ Project Manager (1) Constructors ~ f L1T7ITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. ~h'e assume no responsibility for variation in quality (composition, appearance_ etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our Letters and reports are for the exclusi~~e use of the clients to whom they are addressed and shall not be reproduced except in full ~~~ithout the written approval of Rone Engineering Services, Ltd. -~rp1 Page 2 of 2 ~ r~~ 8908 Ambassador Ro~~, I3allas, TX 7524' 7701 V~1'. Little fork, Suite 600, Houston, Tx 77040 4221 Freidrich Lane.. Suite 195, Austin, "TX 78744 Corporate Phone: (817) 284-]378 IN-PLACE DENSITY TESTING Client: Transweste.rn Commercial Services Report No.: 279207 Mr. Ric Nelson Project No.: 0712786 Transwestern Commercial Services Date of Service: 02/20/2007 SOOT Spring Valley Rd., Ste 600W ' Report Date: 03/17/2007 X 75244 Dallas `I Project: Gateway Business Center Coppell, Texas Services: Perform In-Place Density Test in accordance with .ASTM Standards. PROJECT DATA CONTRACTOR: Constructors & Associates Standard Counts "test Methods: ~ ~ Gauge: froxler 3430 _Vloisture Density ASTM D-<9<2 ASTM D-30]7 Gauge Serial No: 3518 Current: 742 Current: 2542 "Test Mode: DT Previous: 741 Previous: 2537 MOISTURE DENSITY RELATIONS Maximum Project Requirements 114/D No. Descriptlon Moisture % Density pef Moisture Density 1 Dark Brown Clay 27.0 89.0 Minimum +4 92-96 TEST PROBE M/D MOISTURE wET DENSITY DRY DENSTTY DENSITY 'v0 TEST LOCATION DEPTH No. (%) (pcn (pct (% max) Fill 1 Building pad 2, northwest conger, 25' south, 6" 1 33.0 111.3 83.7 94 35' east. 3rd lift Fill 2 Building pad 2, northwest corner, 25' south, 6" 1 32.2 110.9 83.9 94 70' east. 3rd lift Fill 3 Building pad 2, northwest corner, 25' south, 6" 1 31.7 110.6 84.0 94 110' east, 3rd lift Fill 4 Building pad 2, northwest corner, 75' south, 6" 1 31.8 111.2 84.4 95 35' east. 3rd lift Fill 5 Building pad 2, northwest corner, 75' south, 6" 1 33.3 111.3 83.5 94 70' east, 3rd lift LIMITATIONS: The test results presented herein were prepared based upon the specific Samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or an9 other feature of similar subject matter provided b} persons or conditions over H~hich we have no control. Our letters and reports are for the eac]usive use of the clients to ~~-hom they are addressed and shall not be reproduced except in fu]] without the written approval of Rone Engineering Services, Ltd. U7TM Page l of 2 Report No.: ?790? Project No.: 07l?786 Client: Transwestern Commercial Services ,~.. r~ TES"t PROBE Dti~D MOISTURE: ~~°ET DENSITY DRY DENSITY DENSITY NO "LEST LOCATION DEPTH No. (%) (pcf) (pc[} (% max} Fill 6 Building pad 2, northwest corner, 75' south, 6" 1 3l .5 110.7 84.2 95 110' east 3rd lift Fill 7 Building pad 2, southwest corner, 25' north, 6" 1 3 l .4 111.4 84.8 95 35' east. 3rd lift Fill 8 Building pad ?, southwest corner, 25' north; 6" 1 32.2 1 11.2 84.1 94 70' east, 3rd lift Fill 9 Building pad 2, southwest corner, 25' north. 6" 1 31.9 111.1 84.2 95 110' east. 3rd lift Fill l0 Building pad 2, southwest corner, 75' north, 6" 1 31.7 111.8 84.9 95 35' east. 3rd lift Fill l 1 Building pad 2, southwest corner, 75' north, 6" l 35.5 110.7 81.7 92 70' east, 3rd ] ift Fill ]2 Building pad 2, southwest corner, 75' north; 6" 1 35.5 114.5 84.5 95 110' east. 3rd lift Test results on this report m eet project specification. ? Rone er'ng Technician: Joe Jertligan Started: 1:30pm Finished: 3:45pm i~ Report Distribution: ~ (1) Transwestern Commercial Services (I) Murray Construction Co, hoc. Aztec Environmental ~ 1Chae1 COX SET (] j City of Coppell (I) (1) City of Coppell Project Manager (1) Constructors LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. Vde assume no responsibility for variation in quality (composition. appearance., etc_1 or am' other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to N~~hom they are addressed and shall not he reproduced except in full without the Nritten approval of Rone Engineering Services, Ltd. t;T14 Page 2 of 2 ~r 1 [ l~ ~~ 8908 Amhassador Row, Dallas, 'I :k 75247 7701 V1'. LitBc l'orly Suite 600, Houston, TX 77040 4221 Freidrich Lane, Suite 195, Austin, TY 78743 Corporate Phone: (817) 284-1318 IN-PLACE DENSITY TESTING Client: Transwestern Commercial Services Report No.: 279166 Mr. Ric Nelson Project No.: 0712786 Transwestern Commercial Services Date of Service: 02/20/2007 5001 Spring Valley Rd.; Ste 600W Report Date: 03/17/2007 Dallas TX 75244 Project: Gateway Business Center Coppell, Texas Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTR4CTOR: Constructors & .Associates Standard Counts Test Methods: ~ Gauge: Troxler 3430 Moisture Density ASTM D-922 ASTM D-3017 Gauge Serial No: 35518 Current: 742 Current: 2542 Test'1lode: DT previous: 741 Previous: 2537 MOISTURE DENSITY RELATIONS 'Maximum Project Requirements A9JU No. Description Moisture % Density pei' Moisture Density ] Tannish Brown Silty Clay 24.5 93.5 Minimum +4 92-96 2 Dark Brown Clay 27.0 89.0 Minimum +4 92-96 TEST NO TEST LOCATION PROBE DEPTH h1/D MOISTURE ~Vo. (%) WET DENSTTY DRY DENSITY (pci) (pcf) DENSITY (% max) Fill 1 Building pad 2, southwest corner, 25' north, 8" 1 30.8 116.9 89.4 96 35' east, 2nd lift Fill 2 Building pad ?, southwest corner, 25' north, 8" 1 32.7 116.8 88.0 94 70' east, 2nd lift Fill 3 Building pad 2, southwest corner. 25' north, 8" l 32.3 1.16.6 88.1 94 110' eats. 2nd lift Fill 4 Building pad 2, southwest corner. 75' north, 8" 1 32.4 116.5 88.0 94 35' east. 2nd lift LIMITAT]ONS: The test results presented herein were prepared based upon the specific saznples provided for testing. we assume no responsibility for variation in yuality (composition. appearance. etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 7TAI Page 1 of 2 `r:eport ha.. __y i 66 i'roject No.: 0712786 Client: Transwestern Commercial Services ,y. .~ ~ ~ '~ TEST PROBE ~t/D 1fOISTURE ~'1'ET DENSITI' D RY DENSITY DENSITY NU TEST LOCATION DEPTii No. (%) (pcn (pct) (% max) Fill 5 Building pad 2, southwest corner, 7~' north, 8" l 33.7 1 l 62 86.9 93 70' east, 2nd lift Fill 6 Building pad 2, southwest corner, 75' north, 8" 1 32.5 116.5 87.9 94 110' east. 2nd lift Fill 7 Building pad 2, northwest corner. 25' south, 8" l 30.2 112.2 86.2 92 35' east, 2nd lift Fill 8 Building pad 2, northwest corner, 25' south, 8" 1 30.4 112.0 85.9 92 70' east, 2nd lift Fill 9 Building pad 2, northwest corner. 2S south, 8" 2 31.8 111.9 84.9 95 110' east. 2nd lift Fill I 0 Building pad 2, northwest corner, 75' south, 8" 2 30.9* 111.4 85.1 96 35' east, 2nd lift Fill l 1 Building pad 2, northwest corner, 75' south. 8" 2 32.2 l 1 1.8 84.6 95 70' east. 2nd lift Fill 12 Building pad 2, northwest corner. 75' south. 8" 2 30.9* 111.5 85.2 96 l l 0' east, 2nd lift Fi^ 13 Retest X10 above 8" 2 35.2 111.0 82.1 92 Fill 14 Retest #12 above 8" 2 32.4 111.5 84.2 95 An asterisk (*) appears next to test results which do NOT meet the project specifications. Technician: Joe Jernigan Started: 9:45a Finished: 11 Report Distribution: (]) Transwestern Commercial Services (1) Murray Construction Co, Inc. (I) City of Coppefl (1) Aztec Environmental (1) City of Coppell (1) Constructors LIMITA[']O?~S- The test results presented herein were prepared based upon the specific samples provided for testing. ~'.%e assume no responsibility for variation in quality (composition, appearance_ etc.) or am' other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. ?TM Page 2 of 3 ~~ ~ ~ 8908 -ambassador Row, llalfas, T 75247 7701 W. Little York, Suite 600, Houston, TY 77040 ® 422] Freidrich Lane, Snite 195, Austin, TY 78744 Corporate Phone: (817) 284-1318 IN-PLACE DENSITY TESTING Client: Transwestern Commercial Services Report No.: 279296 Mr. Ric Nelson Project No.: 0712786 Transwestern Commercial Services Date of Service- 02/21/2007 5001 Spring Valley Rd., Ste 600W Report Date: 03/17/2007 Dallas TX 75244 Project: Gateway Business Center Coppell. Texas Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CO'VTRACTOR: Constructors & Associates Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density .ASTM D-2922 ASTMD-3017 Gauge Serial No:3J5]$ Current:74~ Current: 2550 Test Mode: DT Previous: 742 Previous: 242 MOISTURE DENSITY RELATIONS Maximum Project Requirements A~1/D No. Description Moisture % Density pcf Moisture Density 1 Tannish Brown Silty Clay 24.5 93.5 Minimum +4 92-96 TEST PROBF, M,~D MOISTURE YET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. (%) (pct (pct) (% max) Fill 1 Building pad 2, northwest corner, 25' south, 6" 1 33.0 1 16.4 87.5 94 35' east, 4th lift Fill 2 Building pad 2, northwest corner, 25' south, 6" l 31.4 1 16.4 88.6 gs 70' east- 4th lift Fill 3 Building pad 2, northwest corner. 25' south. 6" 1 30.8 116.9 89.4 46 110' east, 4th lift Fill 4 Building pad 2, northwest conger, 75' south, 6" ] 32.7 116.8 88.0 94 35' east. 4th lift Fill 5 Building pad 2, northwest corner, 75' south, 6" 1 32.3 116.6 88.1 94 70' east, 4th lift LIMITATIONS: The test recults presented herein were prepared based upon the specific samples provided for testing. we assume no responsibility for variation in quality (composition. appearance, etc.? or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom the}' are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 7Tpq Page 1 of 2 Report Vo.: 2 ~ 9296 - ~~.. .~ Project 10.: 0712786 Client: 7~ranswestern Commercial Services TEST PROBF, M/D MOISTURE \~I ET DE'VSTI'Y D RY DENSTTY DENSITY NO TEST LOCATION DEPTH No. (%) (pcf) (pc>) (% maz) Fill 6 Building pad 2, northwest corner. 75' south, 6" 1 32.4 116.5 88.0 94 110' east, 4th lift Fill 7 Building pad 2, southwest corner. 25` north, ~ 6" 1 33.7 116.2 86.9 93 35' east. 4th lift Fill 8 Building pad 2, southwest corner. 25' north, 6" 1 32.5 116.5 87.9 94 70' east. 4th lift Fill 9 Building pad 2, southwest corner.. 2S north. 6" 1 31.3 116.1 88.4 95 110' east, 4th lift Fill 10 Building pad 2, southwest corner, 75' north, 6" 1 31.6 116.6 88.6 95 35' east, 4th lift Fill 11 Building pad 2, southwest corner, 75' north, 6" 1 30.4 112.0 85.9 92 70' east, 4th lift Fill 12 Building pad 2, southwest corner. 75' north, 6" 1 30.2 1 ] 1.7 85.8 92 110' east. 4th lift Test results on this report meet proje ct specification. Technician: JOe Jernigan Started: 1 1:1 Sa Finished: 12: Report Distribution: fl j Transwestern Commercial Services (l) Murray Construction Co, lnc. (1) City ofCoppell Q j Aztec Environmental (1) City of Coppell l 1 j Constructors Lth4ITA'f IONS The test results presented herein were prepared based upon the specific samples provided for testing. ~b%e assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided b} persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not he reproduced except in full without the written approval of Rone Engineering Services. Ltd. ;Thq Page 2 of 2