Loading...
Vista Point 2R-LR070321 REED EnGinEERInG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Vista Point II, Phase II S.H. 121 at MacA u evard C , Texas REPORTED TO: Bullard Constr P.O. Box Addi , Texas 75001 : Mr. Keith McMahon REPORT NO. 106 REG PROJECT NO. 13581 SAMPLE DATE: 02-21-07 TECHNICIAN: D. Balderas PAGE: 1 of 1 location of Sam Set Number 1 2 Bullard Construction, Inc. Ie location Paving: 65'S, 20'E from SW corner of Bldg. 5 Pavin : 25'S, 70'E from SW corner of Bid . 5 CONTRACT Desi n Information Source of Concrete Redi-Mix 2 1069 1069 1069 1069 Mix Identification 23601504 Date Tested 02-28-07 03-21-07 03-21-07 Hold Age@ Test 7 28 28 H 02-28-07 03-21-07 03-21-07 Hold 7 28 28 H ecified Stren 3600 Total load Ibs. 88040 117640 122480 4250 80450 111360 107690 2850 3940 3810 3880 Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc./Mr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Air Entrainment 5.4 6.3 Ticket Number 13680413 13680434 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc Mail Distribution: (1) Bullard Construction, Inc./ Mr. Keith McMahon (1) City of CoppelllMr. Keith Marvin 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019