Loading...
ST9401-CS 980902NOV -02 -98 MON 06:17 PM REBCON, INC FAX NO. 9721448234 P.02/02 QL�rsN Specialists In Gabion Construction "sari and w or �""„ Craig Olden, Inc. Earth Retention Systems y a A A S September 2, 1998 REBCON, INC.�'��,' 1868 W. Northwest Hwy,`= Dallas Texas 75220. Attention: Mr. Robert Bibby i RE: Geotextile: Denton Tap Road - City of Copp;. Texas° COINC No.- 98 -58 Dear Mr. Bibby: We are requesting additional compensation for the revised type of geotextile specified on the referenced project as per Wier and Associates' memo dated 8/3!98. Please note this revision was made after the contract was awarded. The revised geotextiie, Carthage Mills 30 %, cost an additional $1.25 per Square Yard. Our estimated job quantity of filter fabric required is 1200 SY; therefore, we are requesting compensation for the additional $1,500.00. If you need additional information, please contact me. Yours truly, CRAIG OLDEN, INC. Cindy Holif Id Construction Operations CH:ch P0. Box 5000 • Little Elm, Texas 75068 • Dallas 972 / 294 -5000 • 1- 800- GABIONS • FAX 972 1294-2664 • www gabion.corn NOV-02-98 MON 06:16 PM REBC" INC 9724448234 FAX NO. 971 - 18234 P. 01102 DATE: TO:—a r e ze ✓ FAX Ni L ZvM E L- FRO COv& r e_ Zal- 4 o 49 r 4, e,x, �4 NUNMER, OF PAGES (LNCLUDLNfG THIS COVER SHEET): PLEASE RE_SPONI) IF ALL PAGES-ARE NOT RECEIVED, OBIG NTAL TO FOLLOW VIA MAIL _-L.—NO ORIGWA.L TO FOLLOW