Loading...
Gateway BP CS070307 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Rick 0' Dell Construction Inspector Engineering From: Dennis Lindley, Streets/Traffic Division Public Works Date: March 7, 2007 RE: Walk-thru Gateway Business Park Freeport/Southwestern 1. Rout, clean and seal cracks on drive approaches. 2. Install locking lids on storm inlets. 3. Clean out dirt and debris from storm inlets. 4. Remove zip strip around drain and concrete patch. Clean and seal joint. S. Clean and seal joints on curbs and on all approaches. CITY OF COPPELL PUBLIC WORKS DEPARTMENT J