Loading...
Belt Line Trade-CS070404 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering From: Terry Gaona, Streets Division Public Works Date: April 4, 2007 RE: Walk-thru Belt Line Trade Center Lot 1 Blk 1 1. Cross joints need to be filled in median. 2. Sod needs to be laid at ends of same location. 3. Debris in drainage in rear. CITY OF COPPELL PUBLIC WORKS DEPARTMENT