Loading...
DR8801-CS 890316DeShazo, Starek & Tang, Inc. Engineers · Planners 330 Union Slation · Dallas, Texas 75202 · 214/748-6740 MEMORANDUM TO: FROM: Russell Doyle City Engineer City of Coppell. Texas Paul A. Lipscomb(~ DATE: March 16, 1989 SUBJECT: Bethel Road Drainage Improvements Postal Site to Freeport Parkway Construction Status 88157.04 As you requested, this has been prepared to provide a report on the status of construction for the Project. Field Survey On March 1, 1989, our surveyors made a cursory field survey of the Project to compare the actual construction with the requirements of the plans· A copy of the results of the survey is attached· Horizontal accuracy varies from 0.1 ft at Station 5+55.49 to 1.5 feet at the Point of Tangency (P.T.) near Freeport Parkway. Vertical accuracy varies from 0.4 feet below grade at the downstream flow line_to 0.08 feet above grade at Station 5+55.49. '~'-('$~ O- 3b,$z~)(~ The horizontal tolerances appear to be within acceptable limits and well within the available easement. The vertical tolerances also appear to be acceptable; however, the closer the construction nears the exlstin9 concrete apron of the existing upstream culvert, close tolerances will be essential. ge ConstruCtion Progress According to our measurements, construction had progressed as follows (construction is proceeding upstream) on March 1: Culvert Component Bottom Slab Walls Top Slab Upstream Station 8+19 7+42 4 + 30.25 Memo to Russell Doyle March 16, 1989 Page 2 It is my understanding from a conversation with Steve Morton, today, that the concrete pavement on Freeport is completed and the construction of the asphalt transition is underway. His goal is to open it to traffic on Monday, March 20. After you have had an opportunity to review this report, please notify me of any exceptions or corrections. cc: Steve Morton i 1.r