Loading...
DR8802-CS 900129 ~, I -i) 9 {It' J-~'3 - C(I _ I IlAA JAA/Vf"}- ~ {~ January 29, 1990 /,rv-r- _ . Steve Goram, Director of Public Works . (J) ~~ Russell DOY~itY Engineer r;y ~ r-- Kaye stree~D'ainage Solution / Engineering Analysis Tickler due January 22nd -> 29th .. . " . COPPBLL PUBLIC IiORKS IIB1fORANDUJI DATB: TO: FRON: RE: On Friday, January 26, 1990, we received the executed contracts for Ron Morrison's, Kim1ey-Horn services on the Kaye street evaluation performed. We distributed one original to the City Secretary, one to Ron Morrison and one to the Public Works Department's file. Likewise, we filed all tickler items except my last response memo dated January 15, 1990 (copy attached) to be used for the beginning of the future tickler packet. All previous materials are filed in the central file. On Monday, January 29, 1990, we received copies of the letters written by Mr. Ratliff and Mr. Welch to the Design Engineers, Schrickel, Rollins and Associates, Inc.. It was at a meeting between Mr. Ratliff and Mr. Welch on January 15, 1990 (10:30 a.m.) that it was determined to write those letters. As we discussed, Mrs. Wisner wants to be kept abreast of events on this matter. Building Inspections are now referring all calls to Public Works (Some inquiries deal with Dale's previous letter and promises and I am aware of neither). Tickler 2/J/90 RRD/bb Attachment WISNER.RRD