Burch Lot 1-CS 960115COPPELL ENGINEERING
UTILITII.S DIVISION
MEMORANDUM
DATE: January 15, 1996
TO: Garreth Campbell, Construction Inspector
FROM: Howard Pafford, Utilities Superintendent~~~
< <
RE: Walk thru for
A follow-up walk-thru on the above referenced project was conducted on 1/15/9
and all punch list items have been corrected.
If you have any questions, please advise.
HLP/dg