Sandy Lk Oaks-CS070419T H E C 1 T Y O F
COPPELL 1 -
�
F x A s ' a 9 April 19, 2007
West & Associates
17430 Campbell Road
Suite 110
Dallas, TX 75252
RE: Sandy Lake Oaks Addition Lot l Block A
Fee Assessment Letter
Dear Mr. West
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact lees to the City of Coppell in the amount of $14.060.4 and forward
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer
Impact Fees are due and payable at the issuance of a Building Permit. ,Also, please provide a copy of the
En�,zineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified.
The construction inspection fees must be paid prior to scheduling a pre- construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
K nneth M.
Griffin, P.F.
Director of
Engineering /Public Works
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
Mike Peeples
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Sandy Lake Oaks Addition Lot 1 Block A
Date: 411912007
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
$5,247.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$163.80
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation /Fireline)
$0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$2,997.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
$0.00
(100% due prior to Filing Plat)
Roadway Impact Fee
$14,060.48
$14,060.48
(100% due prior to Filing Plat)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL $22,728.28
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $14,060.48
DEVELOPMENT FEE WORKSHEET
PROJECT: Sandy Lake Oaks Addition Lot 1 Block A
DATE: 411912007
Water Impact Fee:
Domestic Meter(s).
Irrigation Meter(s):
Fireline Meter(s).
1 - 1 112 inch
G
0
1 - 8 inch
= 333
ESU's
= 0
ESU's
= 0
ESU's
= 25
ESU's
Total #: 5 83 ESI l's @ $900.00 ea. $5,247.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total # Connections �' $50.00 ea $100.00
(Single family due prior tc issuance of 1:)i- iildinq permit')
(All other due prior tr :) issuance of rneter)
Domestic Water Meter Fee:
Total # 1 Domestic Meter(s) @ $16380 $163.80
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of rreter)
Irrigation /Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @
Total # 0 Additional Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) Co
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total # 1 Meter( =) :a $30 00 ea
(1 il�` dt_le prl: =r t� � I �6i_JariCe ! :f mater rf iNterS,l
Irrigation /Fire Meter Deposit Fee:
Total # 1 Meters) $30 00 ea
(100% due prior to issuance of meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's 333
(Due prior to issuance of building permit)
$000 $0.00
$0.00 $0.00
nia meter provided by developer
$3000
$3000
@ $900 00 ea $2,997.00
$50.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections C $50 00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total # 1 Lots «' 1.50 O:) ea
(1 OC!o due prior to issr_iance of bujldlr)q �,errYilt)
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
Preliminary plat approved:
0 Single- family @ $0 00 per lot
0 Multi - family Ca To 00 per unit
(1 003 paid pri(: -)r to council ai_�pro��al of final ��lat)
Roadway Impact Fee:
(see attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right -of -way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292 60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for sigr age in the City's n(l'it of -w8y
(see attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment
The contracts should indicate the cost to construct the irnprovemerts
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$000
$0.00
$14,060.48
Information not Available
Information not . Available
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Sandy Lake Oaks Addition Lot 1 Block A
DATE: 411912007
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Office
Land Use **
General Office Buildin
Building Area (sf)
13
Development Units * *
13.11
Vehicle Miles per Development Unit **
7.15
Fee per Vehicle Mile * **
$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $14,060.48
* (Figure 4.1 - Roadway Lnpact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - The Master Fee Schedule)
91Ff U $1060.4.8