Loading...
Sandy Lk Oaks-CS070419T H E C 1 T Y O F COPPELL 1 - � F x A s ' a 9 April 19, 2007 West & Associates 17430 Campbell Road Suite 110 Dallas, TX 75252 RE: Sandy Lake Oaks Addition Lot l Block A Fee Assessment Letter Dear Mr. West Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact lees to the City of Coppell in the amount of $14.060.4 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. ,Also, please provide a copy of the En�,zineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre- construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, K nneth M. Griffin, P.F. Director of Engineering /Public Works cc: Jennifer Miller, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation Mike Peeples 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Sandy Lake Oaks Addition Lot 1 Block A Date: 411912007 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $5,247.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $163.80 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation /Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,997.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $14,060.48 $14,060.48 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $22,728.28 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $14,060.48 DEVELOPMENT FEE WORKSHEET PROJECT: Sandy Lake Oaks Addition Lot 1 Block A DATE: 411912007 Water Impact Fee: Domestic Meter(s). Irrigation Meter(s): Fireline Meter(s). 1 - 1 112 inch G 0 1 - 8 inch = 333 ESU's = 0 ESU's = 0 ESU's = 25 ESU's Total #: 5 83 ESI l's @ $900.00 ea. $5,247.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total # Connections �' $50.00 ea $100.00 (Single family due prior tc issuance of 1:)i- iildinq permit') (All other due prior tr :) issuance of rneter) Domestic Water Meter Fee: Total # 1 Domestic Meter(s) @ $16380 $163.80 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of rreter) Irrigation /Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ Total # 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) Co (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total # 1 Meter( =) :a $30 00 ea (1 il�` dt_le prl: =r t� � I �6i_JariCe ! :f mater rf iNterS,l Irrigation /Fire Meter Deposit Fee: Total # 1 Meters) $30 00 ea (100% due prior to issuance of meters) Wastewater Impact Fee: Total Domestic Meters ESU's 333 (Due prior to issuance of building permit) $000 $0.00 $0.00 $0.00 nia meter provided by developer $3000 $3000 @ $900 00 ea $2,997.00 $50.00 Wastewater Tap Inspection Fee: Total #: 1 Connections C $50 00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total # 1 Lots «' 1.50 O:) ea (1 OC!o due prior to issr_iance of bujldlr)q �,errYilt) $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): Preliminary plat approved: 0 Single- family @ $0 00 per lot 0 Multi - family Ca To 00 per unit (1 003 paid pri(: -)r to council ai_�pro��al of final ��lat) Roadway Impact Fee: (see attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right -of -way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292 60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for sigr age in the City's n(l'it of -w8y (see attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment The contracts should indicate the cost to construct the irnprovemerts that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $000 $0.00 $14,060.48 Information not Available Information not . Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Sandy Lake Oaks Addition Lot 1 Block A DATE: 411912007 ROADWAY IMPACT FEE: Service Area * 1 Category ** Office Land Use ** General Office Buildin Building Area (sf) 13 Development Units * * 13.11 Vehicle Miles per Development Unit ** 7.15 Fee per Vehicle Mile * ** $150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $14,060.48 * (Figure 4.1 - Roadway Lnpact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) * ** (Schedule 2, Page 3 - The Master Fee Schedule) 91Ff U $1060.4.8