Loading...
Mobil Sta MacA-CS 890619 ,......, ..-.. THE DIMENSION GROUP, INC. CIVIL BNOINElllR8 . LAND DEVELOPMENT . PLANNERS . SURVEYORS June 19, 1989 JUN 2 0 1989 ': I ~/l Mr. Larry Davis City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 ."~'';'"'''''''''''''''' '"....__._~~.. ", . Re: Proposed Mobil station on Belt Line Road & MacArthur Blvd. Coppell, Texas S/S# 12-ABM Street Address: 1301 E. Belt Line Road Our Job No: 87005 Dear Mr. Davis: Per your request, we have contacted Trinity River Authority of Texas for sanitary sewer connection and we were advised to submit enclosed request application and plan & profile to City of Coppell. Please advise if you have any questions or need further assistance. Sincerely, ~~ Carlos Salinas Enclosure CC: Mr. Robert Starkley - Trinity River Authority Mr. James Nelson - Mobil Oil Corporation Mr. Bobby Lewis - R.K.J. Construction (Mobil Job Site) 3455 HIGHLAND ROAD SUITE 100 DALLAS. TEXAS 75228 (21"') 32....9195 A I 'I-\Ltifiltr't 1 A T~ITY RIVER AUTHORITY OF TEXAS _ NORTHERN REGION PROJECTS REQUEST FOR A POINT OF-ENTRY qlO 0 {' CONTRACTING PARTY: CITY OF COPPELL PROPOSED PROJECT NAME: MOBIL STATION DESIGN ENGINEER: THE DIMENSION GROUP1 INC. CONTACT: MOSTAFA SETAYESH TELEPHONE NO. 324-9195 LOCATION OF PROPOSED CONNECTION (TRA NOMENCLATURE). NOTE: DETAILS CONCERNING TRA INTERCEPTORS ARE AVAILABLE FROM THE PROJECT BUT SHOULD BE VERIFIED IN THE FIELD PRIOR TO SUBMITTAL. PROJECT CR\~S x TMC INTERCEPTOR: COPPELL INTERCEPTOR STATION NO.: 163+95 PLANNED LAND USE FOR THE AREA TO BE SERVED: COM'w1ERC IAL" ACREAGE: INITIAL FLOW EXPECTED: ULTIMATE FLOW EXPECTED: . BASIS FOR ESTABLISHING FLOWS: MGD (DAILY AVERAGE) MGD (DAILY AVERAGE) MGD (PEAK) MGD (PEAK) TYPE .OF CONNECTION: EXISTING MANHOLE: SIZE OF CONNECTION: 8" TAP CONSTRUCT MANHOLE: SLOPE AT CONNECTION: 8" MATERIAL OF CONNECTION: P.V.C. METERING FACILITY PROPOSED? YES x NO IF YES, EASEMENT DOCUt1ENTS FOR THE METER STATION AND ACCESS ROAD MUST ACCOMPANY '", THIS REQUEST TYPE - . ..-.. -- ATTACHMENTS ACCOMPANYING THIS REQUEST CONTAIN: (PLEASE CHECK)* CONNECTION: PLAN SHEETS PROFILE SHEETS SPECIFI CATIONS x METERING FACILITY: PLAN SHEETS PROFILE SHEETS CONSTRUCTION PRINTS CONSTRUCTION SPECIFICATIONS EQUIPMENT SPECIFICATIONS GENERAL: SERVICE AREA MAP (INCLUDES DRAINAGE AREA, CITY BOUNDARIES, AND NAME OF DEVELOPMENT) REQUEST TO BE SIGNED BY THE CONTRACTING PARTY: NAME: SIGNATURE:l DATE: TITLE: CONTRACTING PARTY: * REQUESTS WITHOUT THE ABOVE INFORMATION WILL BE DELAYED UNTIL ALL THE INFORMATION IS RECEIVED. . ~**********************************************************************************************~ TRA USE ONLY POE NO. THE ABOVE POINT OF ENTRY IS HEREBY SUBJECT TO THE FOLLOWING CONDITIONS: SIGNED: APPROVED BY: CC: NORTHERN REGION OFFICE DATE: DATE: