Loading...
Vista Point 2R-LR070420 REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 110 REPORT DATE: 04-20-07 REG PROJECT NO. 13581 DATE OBSERVED: 04-06-07 TECHNICIAN: R. Weathersby PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Paving: 170-250'S, 40'E-75'W from S.E. corner of Building 6. Paving: 72-165'N, 1 07-200'E from S.E. corner of Building 6, Section 2. I Reference Plans or Notes Used: I Sheet C6.1 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Company! Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald FReed, P.E. BW Irs Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell!Mr. Keith Marvin __~_EED I EnGinEERinG GEOTECHNICAL AND ! G R 0 U P ENVIRONMENTAL CONSULTANTS I REPORT OF FIELD DENSITY TESTS Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 111 REPORT DATE: 04-20-07 REG PROJECT NO. 13581 TECHNICIAN: L.T. Edwards PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. Proctor ASTM Optimum No. Standard Descri tion Moisture, % 1 0-698 Brown sandy clay w/rock 12.3 2 0-698 Oark gray clay 27.5 3 0-698 Oark brown sandy clay (lime-treated) 22.8 4 0-698 Brown sandy clay wlaggregate (Iime- 18.1 treated) 5 0-698 Brown cia Ii me-treated 21.8 98.6 Field Field Test Density Moisture Proctor Compaction No. Date Location cf % ID Level % 187 04-11-07 Paving: 50'N, 50'W(1) 104.9 14.1 1 95.1 188 Paving: 45'S, 15'W(1) 108.1 13.1 1 98.0 189 Pavin : 60'N, 35'W 2 106.1 13.5 1 96.2 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.W. corner of Building 6. (2) Measurements referenced from S.W. corner of Building 6. Extranet Distribution: (1) Jackson Shaw Company/ Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . fAX [214] 3500019 REED EnGinEERinG ------ GEOTECHNICAL AND G R 0 U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. P.O. Box 575 Addison, Texas 75001 A TTN: Mr. Keith McMahon REPORT NO. 112 REPORT DATE: 04-20-07 REG PROJECT NO. 13581 DATE OBSERVED: 04-11-07 TECHNICIAN: L. 1. Edwards PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. I Items Observed: I Paving: 75'SW, 400'NW from S.W. corner of Building 6. I Reference Plans or Notes Used: I Sheet C6.1 x IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Extranet Distribution: (1) Jackson Shaw Companyl Mr. Christopher Gardner (1) AECC, Inc.lMr. Todd Waters (1) Jackson Shaw Company Ms. Michelle Graham Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr. Keith McMahon (1) City of Coppell/Mr. Keith Marvin Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. . SUITE 400 . DALLAS. TX 75235 . TEL [214] 3505600 . fAX [214J 350 0019