Loading...
Gateway BP(3.1)-LR070416Rone Engineering 1 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Project: Gateway Business Center Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sampleF. back to the laboratory for curing and testing in accordance with applicable standards. Services: Contractor: Constructors Associates Concrete Supplier: Redi -Mix Concrete Plant: 136 Specification Requirements Strength: 3,000 psi 28 days Slump (in.): 5" 7" Air NA Test Method: ASTM C -172 ASTM C -31 (except 10.1.2) ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Cylinder Marked Date Age Set No. Tested (days) 1 1 04/04/2007 7 1 2 04/25/2007 28 1 3 04/25/2007 28 1 4 HOLD Diameter (in) 6.00 PROJECT DATA Mix Design I.D.: Placement Date: Weather Conditions: Time Sampled: Temperature Air: Truck No: Air Content: Concrete Compressive Strength Test Overall Placement Location: Piers, see report #283063 Sample Location: Pier F/9 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) Area (in') 28.27 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Friedrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report No.: 283064 Project No.: 0712786 Date of Service: 03/28/2007 Report Date: 04/16/2007 1521 03/28/2007 Partly cloudy 11:25am Batch time: 10:41 am 82 °F Concrete: 79 °F 1036 Ticket No: 13683560 NA Unit Weight (pcf): NA 83,160 Compressive Strength (psi) 2,940 Measured Slump (inches) 5.0 Fracture Type Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB /KG) Page 1 of 2 Rone Engineering Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Contractor: Constructors Associates Concrete Supplier: Redi -Mix Concrete Plant: 136 Specification Requirements Strength: 3,000 psi 28 days Slump (in.): 5" 7" Air NA Test Method: ASTM C -172 ASTM C -31 (except 10.1.2) ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Cylinder Marked Date Age Set No. Tested (days) 1 1 04/05/2007 7 1 2 04/26/2007 28 1 3 04/26/2007 28 1 4 HOLD Diameter (in) 6.00 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Friedrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 Report of Concrete Compressive Strength Tesi Report No.: 283182 Project No.: 0712786 Date of Service: 03/29/2007 Report Date: 04/16/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sampleF. back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Mix Design I.D.: 1521 Placement Date: 03/29/2007 Weather Conditions: Cloudy Time Sampled: 08:15am Batch time: 07:40am Temperature Air: 68 °F Concrete: 79 °F Truck No: 1190 Ticket No: 13683671 Air Content: NA Unit Weight (pcf): NA Overall Placement Location: Piers E/7.3, E.917.3, E.917.4, AA/8.6 and pier caps on line 6 of building 1 Sample Location: Pier E/7.3 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) Area (in') 28.27 102,530 Compressive Strength (psi) 3,630 Measured Slump (inches) 6.0 Fracture Type Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM /KG) Page 1 of 2