Loading...
DR8801-CS 881202 (2)DeShazo. Starek & 'lang. Inc. Engineers · Planners 331} Union Station · Dallas, Texas 7521}2 · 214/748-~740 December 2. 1988 Mr. David Sorrell Buckelew Construction Co. 2880 LBJ Freeway, Suite 259 Dallas, Texas 7523~ Re: ~5~1~ Improvements nection Detail for Storm Sewer Pipe Pi pe-to at Station 0-28 88157.0~ Dear Mr. Sorrell: Change Order No. I includes a special detail requiring additional reinforcement of pipe-to-structure connections. The bottom of the box has been poured at the above location without the required additional reinforcement. In lieu of removing the work, we will require that the additional reinforcement be field welded to ,the existing culvert steel as shown on the attached sketch. Please do not hesitate to call if you have any questions. Sincerely. ~ -CI3~[e' L. Sit'foi~, P.E. Director, Civil/Engineering CLS/np attachments cc: Steve Morton w I attachments OTHER STEEL IN BOX TO REMAIN UNCHANGED 2-~ 9 E.S. (EACH SIDE) ~6 E.S. FIELD WELD TYR EACH PLACE 30~ OPENING EX. BAR D 2-~1~9 E.S. L YTYP. ~ --BOTTOM EX. BOX ADDITIO. NAL REINFORCEMENT FOR PIPE TO STRUCTURE CONNECTION CULVERT STATION 0-28 BETHEL ROAD DRAINAGE, IMPROVEMENTS N.T.$. NOVEMBER $0,1988 88157.04