Loading...
DR8801-LR 881128/~_~ The City With A Beautiful Futu UTILITY LINE ~_~ INSPECTION AND TESTING Project: Date: Area,.' PRESSUI~E TEST P.O. Box 478 Coppell, Texas.75019 214 - 462 - 0022 START Pressure: ¢¢ Diameter: FINISH Time: Pressure: Length: Z~?C~tr Plan Sheet No: ~llowable Leakage (Gals) for q hours S = Length of Pipe, Ft. E) = Diameter of Pipe, In,. P = 150 psi . SDV - 133,200 x4 Allowable Loss = Valve Leakage Allowable = 0.0078 Gal/Hour/In. of nominal valve size Test - Gray Iron. Ductile Ir0n, Plastic, and AC at 150 psi - Concrete 120% of Design Pressure - Steel 120% Min. to 150% Max. Design Working Pressure [ ~ 3.'0 Oal. Lost) ( Z~ Hrs. Tested) "O0M "IVI~E~NTS: '..~';"'"-"~' ", . Tested Performed By: Passed or Rejected By: