Loading...
St Ann Catholic-LR070226REPORT OF REINFORCING & POST TENSION STEEL Irerracon OBSERVATION Consultlna Enalneers & Selentists CORRECT 8901 Carpenter Frwy., Suite #100 ITEMS OBSERVED Dallas, Texas 75247 INCORRECT ( ?14)630 -1010 Date of Service: 02/26/07 Client No.: 106235 Client: St. Arm Catholic Church 180 Samuel Blvd. Coppell, TX 75019 Report No.: 94061334.0044 Project No.: 94061334 Project: St. Ann Catholic Parish New Addition 180 Samuel Blvd. Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Civil Sheets C1.1 /Sidewalk of SE corner of building, dated August 2006 Locations /Items Observed: Sidewalk, W side of Shopping Center & SE corner of Church Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape X Column Tie Spacing & Type Bar and Cable Size X Proper Placement X Stirrup Spacing & Type Bar and Cable Grade X Property Tied X Cables Property Wrapped Rebar and Cables Clean X Dowel Bars in Place Mechanical Splices Trash & Debris Removed X Proper Supports X Lapped Splices Number of Bars and Cables X Proper Cover /Clearance X Proper Drape of Cables Discrepancies /Comments: No discrepancies were noted at the time of this observation. Field Results Report To: Technician: G. Martin Report Distribution: (1) St Ann Catholic Church (1) Page Southerland Page (1) City of Coppell TX (1) Technistructures (1) City of Coppell TX (1) Pacheco Koch Consulting Engineers A. Bulent Ethem, P.G., Project Manager 309pdr This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon