Loading...
DR8801-CS 881121COPPELL PUBLIC WORKS MEMORANDUM November 21, 1988 TO: Steve Goram, Director of Public Works FROM: Steven M. Morton, Chief Developmental Inspector ~ RE: Bethel Rd. Drainage Improvements / Change Order #1 Steve, I have received and reviewed C.O. #1 proposal as of this date. I have no problem with this change. · The detour notification dates reflects the additional time it will take to pour-in-place in lieu of precast. I anticipated this when I put the fees for testing estimate together. I believe all basis are covered going in. Thank you. SMM/bb