Loading...
MacArthur Vista-LR070423PEEa EI--1GIr'"1EEA11-1G GEOTECHNICAL AND G R O U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION MacArthur Vista Center 670 N. MacArthur Boulevard Coppell, Texas REPORTED TO: MacArthur Vista, LP 12201 Merit Drive, Suite 170 Dallas, Texas 75251 ATTN: Mr. Alen Hinckley REPORT NO. 32 REPORT DATE: 04-23-07 REG PROJECT NO. 14082 DATE OBSERVED: 03-30-07 TECHNICIAN: D. Rico PAGE: 1 of 1 CONTRACTOR: Royal General Contractors, Inc. Items Observed: Retaining wall: 30-55'S, 30-55'W from N.W. building corner Light pole bases: 70'S, 70'E and 45'S, 60'W from S.W. building corner. Reference Plans or Notes Used: Sheets A101 and RFI 613 Comments: All the deviations noted on 3-29-07, Report No. 31 were corrected. OThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) MacArthur Vista, LP/ Mr. Alen Hinckley (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Rick O'Dell (1) Daniels & Associates/ Mr. Brent Lovelady (1) Royal General Contractors/ Mr. Bob Fowles (1) Royat General Contractors/ Mr. Micah Corn (1) UBSE/Mr. Gary Ten Eyck Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 rep [214] 350 5600 Fax. [214] 350 0019 REEL7 I Er"lGlr'IEER11-"1G GEOTECHNICAL AND i G R O U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION MacArthur Vista Center 670 N. MacArthur Boulevard Coppell, Texas REPORTED TO: MacArthur Vista, LP 12201 Merit Drive, Suite 170 Dallas, Texas 75251 ATTN: Mr. Alen Hinckley REPORT NO. 31 REPORT DATE: 04-23-07 REG PROJECT NO. 14082 DATE OBSERVED: 03-29-07 TECHNICIAN: D. Rico PAGE: 1 of 1 CONTRACTOR: Royal General Contractors, Inc. Items Observed: Retaining wall: 30-55'S, 30-55'W from N.W. building corner. Light pole base: 70'S, 70'E and 45'S, 60'W from S.W. building corner. Reference Plans or Notes Used: Sheets A101 and RFI G13 List Deviations Noted: 1) #3 at 12" O.C. vertical and horizontal rebar missing at exterior face of retaining wall. 2) Six #6 vertical bars were placed in light pole bases instead of eight #6 vertical bars. The noted deviations were reported to: Superintendent xOThe noted deviations were not corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) MacArthurVista, LP/ Mr. Alen Hinckley (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Rick O'Dell (1) Daniels & Associates/ Mr. Brent Lovelady {1) Royal General Contractors/ Mr. Bob Fowles (1) Royal General Contractors/ Mr. Micah Corn (1) UBSE/Mr. Gary Ten Eyck Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/rs 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 • rep [214] 350 5600 • Fsx [214] 350 0019