MacArthur Vista-LR070405REEL7 EI""1G11-'IEEF~Ir'7G
GEOTECHNICAL AND G R O U P
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
MacArthur Vista Center
670 N. MacArthur Boulevard
Coppell, Texas
REPORTED TO: MacArthur Vista, LP
12201 Merit Drive, Suite 170
Dallas, Texas 75251
ATTN: Mr. Alen Hinckley
REPORT NO. 25
REG PROJECT NO. 14082
SAMPLE DATE: 03-08-07
TECHNICIAN: E. Barrington
PAGE: 1 of 1
CONTRACTOR: Royal General Contractors, Inc.
ocation of Sam le
_ Set Number Location Quantity Represented
1 Paving: East half of North property entrance 10/10
lesi n Information
Source of Concrete Mix Identification Specified Strength p.s.i.
Redi-Mix 336L1504 3600
Test Results
Set Cylinder Age @ Total Load Compressive Average
No. ID Date Tested Test lbs. Stren th .s.i. Stren th .s.i.
1 1669 03-15-07 7 118350 4190
1669 03-15-07 7 114130 4040 4120
1669 04-05-07 28 151070 5350
1669 04-05-07 28 152130 5380 5370
r..~:.•.~e. n~+~
Set
No. Cylinder
ID
Slum Time of
Sam le
Air Tem Concrete
Tem Air
Entrainment Ticket
Number
1 1669 4.5 1:35PM 75 73 4.2 59004165
Mail
Distribution: (1) MacArthur Vista, LP/
Mr. Alen Hinckley
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Rick O'Dell
(1) Daniels & Associates/
Mr. Brent Lovelady
(1) Royal General Contractors/
Mr. Bob Fowles
(1) Royal General Contractors/
Mr. Micah Corn
(1) UBSE/Mr. Gary Ten Eyck
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/Inc
2424 STUTZ DR. SUITE 400 • DALLAS, TX 75235 rep [214] 350 5600 Fnx [214) 350 0019