Loading...
MacArthur Vista-LR070329F~EEa EI-'IG11--IEEF~I~-"1G GEOTECHNICAL AND G R O LJ P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT MacArthur Vista Center 670 N. MacArthur Boulevard Coppell, Texas REPORTED TO: MacArthur Vista, LP 12201 Merit Drive, Suite 170 Dallas, Texas 75251 ATTN: Mr. Alen Hinckley REPORT NO. 22 REG PROJECT NO. 14082 SAMPLE DATE: 03-01-07 TECHNICIAN: T. Miller PAGE: 1 of 1 CONTRACTOR: Royal General Contractors, Inc. ocation of Sam le Set Number Location Quantity Represented 1 Paving: 130'S, 30'W from SW bldg. corner 50/220 2 Paving: 90'S, 7'E from SW bldg. corner 220/220 -esi n Information Source of Concrete Mix Identification Specified Strength p.s.i. Redi-Mix 336L1504 3600 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load lbs. Compressive Stren th .s.i. Average Stren th .s.i. 1 1345 03-08-07 7 100570 3560 1345 03-29-07 28 133520 4730 1345 03-29-07 28 133950 4740 4740 1345 Hold H 2 1346 03-08-07 7 105450 3730 1346 03-29-07 28 142800 5050 1346 03-29-07 28 144320 5110 5080 1346 Hold H tinder Data Set Cylinder Time of Concrete ( Air I Ticket I No. I ID Slump I Sample I I Air Temp. Temp. Entrainment Number 1 1345 6.5 12:OOPM 69 77 5.0 59003607 2 1346 4.5 2:05PM 68 76 5.0 59003623 Mail Distribution: (1) MacArthur Vista, LP/ Mr. Alen Hinckley (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Rick O'Dell (1) Daniels & Associates/ Mr. Brent Lovelady (1) Royal General Contractors/ Mr. Bob Fowles (1) Royal General Contractors/ Mr. Micah Corn (1) UBSE/Mr. Gary Ten Eyck Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc 2424 STUTZ DR. • SUITE 400 DALLAS, TX 75235 Tee [214] 350 5600 Fnx [214J 350 0019